A continuous casting funnel mold molten steel solidification and billet simulation device and its application method
A technology of simulating device and crystallizer, applied in the field of iron and steel metallurgy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] The equipment used in this example is figure 1 shown.
[0070] In this embodiment, the steps of the continuous casting funnel mold molten steel solidification and slab simulation method are as follows:
[0071] 1) Put a 50Kg experimental steel block with a size of 50×50×50mm into the induction steelmaking furnace, and in the case of argon protection, start the induction heating to heat the molten steel to 1500°C and keep it for 20 minutes until it is completely melted into steel liquid.
[0072] 2) Add 100g of mold slag particles to the surface of the molten steel. The high-temperature molten steel will melt the mold slag particles into a liquid state and cover the surface of the molten steel to absorb the floating inclusions on the surface of the molten steel. After 5 minutes, the surface of the molten steel will absorb the inclusions. Remove the protection residue.
[0073] 3) Add 200g of mold slag particles to the molten steel again, and after standing for 10 min...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


