Anchor cable construction method in high-water-pressure soil layer support engineering in loess area
A construction method and high water pressure technology, applied in infrastructure engineering, construction, sheet pile walls, etc., can solve problems such as poor stability, poor slurry solidification effect, affecting the strength and speed of forming, to ensure quality and improve protection. effect, the effect of enhancing the firmness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0029] The technical solution in the present invention will be clearly and completely described below in conjunction with the content of the present invention. Obviously, the described content is only a part of the content of the present invention, not the whole content. Based on the contents of the present invention, all other contents obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0030] The invention provides an anchor cable construction method in a high water pressure soil layer support project in a loess area, comprising the following steps:
[0031] S1: construction preparation,
[0032] Firstly, the equipment, tools and auxiliary materials required for construction are ready for use, and anchor cable positioning holes are selected in a rectangular array on the side wall of the excavated foundation pit;
[0033] S2: initial drilling,
[0034] Install a preliminary drilling head...