Unlock instant, AI-driven research and patent intelligence for your innovation.

Cross-regional scheduling method and system for coal mine operation and maintenance resources

A scheduling method and cross-regional technology, applied in the field of coal mine resource management, can solve problems such as low production efficiency and time delay, and achieve the effect of improving production efficiency, realizing informatization, and solving time delay.

Pending Publication Date: 2021-06-01
西安合智宇信息科技有限公司
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Aiming at the technical problems existing in the prior art, the present invention provides a method and system for cross-regional scheduling of coal mine operation and maintenance resources, which solves the problems of time delay and low production efficiency caused by untimely information transmission, and enables the center to Management personnel and business maintenance personnel receive work orders in a timely manner, and carry out timely and efficient scheduling of storage materials and business personnel

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cross-regional scheduling method and system for coal mine operation and maintenance resources
  • Cross-regional scheduling method and system for coal mine operation and maintenance resources
  • Cross-regional scheduling method and system for coal mine operation and maintenance resources

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. the embodiment. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0032] The present invention provides a method for cross-regional scheduling of coal mine operation and maintenance resources, including:

[0033] The cloud platform service center is used as a unified dispatch center for all warehouses and personnel to realize the overall management and control of personnel and materials;

[0034] The front-line production personnel of the mine sid...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a cross-regional scheduling method and system for coal mine operation and maintenance resources, and the method comprises the steps that a service center issues work orders, and the work orders comprise an equipment fault maintenance work order, a regular inspection work order and a spare part demand work order; a plurality of executors obtain the work order and confirm whether to receive the work order; if any executor receives the work order, the situation that the work order is received can be fed back and the executor executes the work order to the service center; if the work order is not received, each executor feeds back a reason that the service center does not receive the work order, and the service center judges whether the reason that the work order is not received is agreed or not; if the service center agrees to not receive the reason of the work order, the work order is stopped from dispatching; and if the service center does not agree with the reason for not receiving the work order, the service center issues the work order again until the work order is received. According to the invention, the problems of time delay and low production efficiency caused by untimely information transmission are solved.

Description

technical field [0001] The invention belongs to the technical field of coal mine resource management, and in particular relates to a method and system for cross-region scheduling of coal mine operation and maintenance resources. Background technique [0002] The massive consumption of coal resources will inevitably be accompanied by a large amount of mining, and improving mining and work efficiency has become an important link in the work. With the modernization of coal mining technology and the progress of science and technology, the functions of the machines used in coal mining are becoming more and more perfect, the mechanism is becoming more and more complex, and the degree of automation is getting higher and higher. On the one hand, the efficiency of mining is greatly improved. On the other hand, There are more and more factors that affect the operation of the machine, and there are more and more factors that cause failure. The failure of one component may cause a chain...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/00G06Q10/06G06Q10/08
CPCG06Q10/06311G06Q10/0875G06Q10/20
Inventor 董博李旭李世辉田斌肖剑张晓江徐礼君刘洪涛党恩辉李浩史云
Owner 西安合智宇信息科技有限公司