A waterproof and drainage device for water conservancy construction and its use method
A technology for drainage devices and water conservancy projects, which is applied in water conservancy projects, water conservancy engineering equipment, infrastructure projects, etc., and can solve the problems of slow seepage and affecting construction efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] The application discloses a water conservancy engineering construction waterproof and drainage device. refer to figure 1, the water conservancy project construction waterproof drainage device comprises a water pipe 1, a water storage barrel 11 and a power part 12, the water pipe 1 is arranged on the construction side wall, the power part 12 is arranged on the water pipe 1, one end of the water pipe 1 is arranged in the water storage barrel 11, and the other end Set outside the water storage bucket 11, the power part 12 can be set as a water pump, and the water on the construction side wall enters the water storage bucket 11, and then the water is driven by the water pump to be discharged through the water pipe 1.
[0043] refer to figure 2 and image 3 , in order to facilitate the discharge of water seeping from the side of the construction, a water collecting pipe 2 is arranged on the water pipe 1. 21 communicates with the water pipe 1 through a corrugated pipe, th...
Embodiment 2
[0053] A method for using a waterproof and drainage device for water conservancy construction, comprising the following steps:
[0054] In the first step, pull the slide bar 61 to drive the limit plate 63 and the clamping plate 44 to separate, then rotate the water diversion tank 1 4, and the water diversion tank 1 4 drives the water diversion tank 2 5 to rotate through the connecting rod 51 until the water diversion tank 1 4 and the water diversion tank 2 5 is in the unfolded state.
[0055] In the second step, the inserting tube 22 is inserted into the side wall to fix the water collecting pipe 2. When inserting, keep the end of the inserting tube 22 facing away from the water collecting pipe 2 inclined to the side away from the ground.
[0056] In the third step, a plurality of water collecting pipes 2 are evenly spaced on the construction side wall, and the water collecting pipes 2 are fastened and connected by ferrules 21 and connecting sleeves 32 .
[0057] The fourth s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


