A grouting device and grouting method for controlling high-speed railway embankment settlement
A technology for high-speed railways and grouting devices, which is used in roads, soil protection, infrastructure engineering, etc. It can solve problems such as large changes in grouting pressure, large equipment vibration, and stratum changes, reducing vibration and improving uniformity. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0048] Such as figure 1 with figure 2 As shown, this embodiment provides a double-layer self-circulating pressure-maintaining grouting device, including a grouting machine 1, a grouting pump 2 and a grouting pipe 3, and the grouting pump 2 is communicated with the grouting machine 1, so that The grouting pipe 3 includes an inner pipe 4 and an outer pipe 5. The top of the inner pipe 4 is fixedly provided with a fixed disk 26, and the two ends of the outer pipe 5 are open structures, and a fixed ring 27 is arranged at the upper open end. The fixed disk 26 and The fixing ring 27 is threaded and connected, so that the outer pipe 5 is placed on the outer surface of the inner pipe 4; the top of the inner pipe 4 is connected with the connecting pipe 8, and the upper part of the side wall of the outer pipe 5 is connected with a circulation pipe 9, and the connecting pipe 8 And the circulation pipe 9 is connected with the outlet and return port of the external grouting pump 2, thereb...
Embodiment approach 2
[0053] Such as image 3 with Figure 4 As shown, this embodiment discloses a double-layer self-circulating pressure-maintaining grouting device on the basis of Embodiment 1, a grouting machine 1, a grouting pump 2 and a grouting pipe 3, and the grouting pipe 3 includes an inner Tube 4 and outer tube 5, the bottom of the outer tube 5 is an open structure, and the open end of the bottom of the outer tube 5 is connected with a diversion cover 22 for sealing by a screw thread, and the outer edge of the diversion cover 22 is provided with an arc-shaped The second diversion surface 23, the center of the diversion cover 22 is provided with a split column 24 whose top is in contact with the bottom surface of the inner tube 4, and the side of the split column 24 is provided with an arc-shaped first diversion surface 25, and the The first guide surface 25 is smoothly connected with the second guide surface 23 .
Embodiment approach 3
[0055] This embodiment, as another basic embodiment of the present invention, discloses a grouting method for controlling high-speed railway embankment settlement: comprising the following steps:
[0056] S1. Drill the grouting pipe installation holes from both sides of the high-speed railway subgrade to the grouting area directly below the subgrade; and ensure that the grouting pipe installation holes on the left and right sides are drilled alternately;
[0057] S2. Install the grouting pipes in the grouting pipe installation holes, and at the same time group the grouting pipes according to the requirements of the grouting pressure and equipment power, and connect the same group of grouting pipes to the same set of grouting devices;
[0058] S3. Drill a monitoring hole from one side of the railway embankment, and the terminal of the monitoring hole is located between the grouting area and the embankment; install the soil layer deformation sensor in the monitoring hole, and con...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap