Building waterproof engineering construction treatment method

A technology for building waterproofing and treatment methods, applied in construction, building components, building structures, etc., can solve problems such as large operation errors, threats to workers' personal safety, and sealing cloth falling off, so as to reduce risks, reduce risk factors, and avoid inefficient effect

Active Publication Date: 2021-06-22
中纸宏泰生态建设有限公司
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the following problems exist in the process of building waterproof construction: a. In the traditional floor gap waterproofing process, since the adhesive is added to the floor gap, and then the sealing cloth is manually attached to the floor gap, the sealing cloth and adhesive Cooperate with each other to waterproof the gaps in the floor, the efficiency of manual work is low, and the operation error is large. At the same time, the danger of workers working at heights increases, threatening the personal safety of workers. There are burrs and protrusions on the end surface during the forming process, which leads to uneven application of the adhesive. At the same time, due to the presence of burrs and protrusions during the attaching process of the sealing cloth, the sealing cloth and the floor are not tightly bonded, which easily leads to the peeling off of the sealing cloth , poor waterproof effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building waterproof engineering construction treatment method
  • Building waterproof engineering construction treatment method
  • Building waterproof engineering construction treatment method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.

[0034] Such as Figure 1 to Figure 8 As shown, a construction treatment method for building waterproofing works, the construction treatment method for building waterproofing works adopts a building waterproofing device, the building waterproofing device includes a working frame 1, a driving mechanism 2, a universal wheel 3, and a grinding mechanism 4 And attachment mechanism 5, described working frame 1 right end surface is equipped with drive mechanism 2, and working frame 1 lower end surface is provided with No. 1 groove, and No. 1 groove interior is successively installed with attachment mechanism 5 and Grinding mechanism 4, universal wheel 3 is installed symmetrically front and back on the left side of the working frame 1 lower end face.

[003...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a building waterproof engineering construction treatment method. A building waterproof device is adopted and comprises a working machine frame, a driving mechanism, universal wheels, a polishing mechanism and an attaching mechanism. The building waterproof device can solve the following problems that a, in the traditional floor slab gap waterproof process, adhesives are added into floor slab gaps, sealing cloth is manually attached to the floor slab gaps, the sealing cloth is mutually matched with the adhesives to perform waterproof treatment on the floor slab gaps, the manual operation efficiency is low, the operation error is large, the risk of high-altitude operation workers is increased, and the personal safety of the workers is threatened; and b, in the traditional adhesive coating process, the adhesive is uneven to coat due to the fact that burr protrusions exist on the end face of a floor slab in the forming process, meanwhile, the sealing cloth and the floor slab are not tightly attached, the sealing cloth is prone to falling off, and the waterproof effect is poor due to the fact that in the attaching process of the sealing cloth, the burr protrusions exist.

Description

technical field [0001] The invention relates to the field of building waterproof construction, in particular to a construction treatment method for building waterproof engineering. Background technique [0002] Due to errors in materials and construction during the building process, cracks appear in the building during use. Measures taken from the building materials and structure to prevent water from penetrating certain parts of the building. Waterproofing is mostly used in roofs, underground buildings, underground parts of buildings, inner chambers and water storage structures that need to be waterproofed. According to the different measures and means adopted, it can be divided into two categories: material waterproof and structural waterproof. Material waterproofing is to rely on building materials to block the passage of water to achieve the purpose of waterproofing or increase the ability to resist leakage, such as waterproofing of coiled materials, waterproofing of co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/66E04B1/68B24B9/06B24B47/12B24B55/06
CPCE04B1/66E04B1/68E04B1/6806B24B9/06B24B47/12B24B55/06
Inventor 王宇陈龙
Owner 中纸宏泰生态建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products