Construction method of interlayer connection joints of combined prefabricated concrete walls

A technology of prefabricated concrete and interlayer connection, which is applied in the direction of walls, building components, floors, etc. It can solve the problems of difficulty in ensuring the verticality of prefabricated wall installation, inconvenient hoisting and temporary fixing of prefabricated shear walls, and increased construction costs. , to achieve the effect of enhancing the quality of connection installation, shortening the construction period, and reducing the amount of steel

Active Publication Date: 2021-06-22
KUNSHAN CONSTRUCT ENG QUALITY TESTING CENT +1
View PDF13 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this type of connection brings inconvenience to the hoisting and temporary fixing of the prefabricated shear wall. During installation, the prefabricated shear wall must be erected in mid-air to bind the steel bars in the cast-in-place connection area and the cast-in-place connection area. concrete
Ordinary oblique supports cannot complete the erection task, and a special modification design is required for the supports, which increases the construction cost and affects the construction efficiency. Even so, it is difficult to guarantee the verticality of the prefabricated wall installation, which will eventually affect the construction quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of interlayer connection joints of combined prefabricated concrete walls
  • Construction method of interlayer connection joints of combined prefabricated concrete walls
  • Construction method of interlayer connection joints of combined prefabricated concrete walls

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, so that those skilled in the art can better understand the present invention and implement it, but the examples given are not intended to limit the present invention.

[0040] refer to figure 1 with figure 2As shown, an embodiment of the construction method of the interlayer connection node of the combined prefabricated concrete wall of the present invention first adopts the self-developed combined wall structure as a component element of the connection node. Specifically, the connection node includes the lower layer The combined wall 1, the upper combined wall 2 and the laminated slab prefabricated floor 3 on both sides are assembled and poured to form a cross-shaped structure. The lower combined wall and the upper combined wall have the same structure and include integrated prefabricated shears The force wall 4, the lightweight infill wall 5 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method of interlayer connection joints of combined prefabricated concrete walls. The construction method comprises the steps that the two combined walls and laminated slab prefabricated bottom plates on the two sides are assembled in a matched mode and poured to form the interlayer connection joints, each combined wall comprises a shear wall, a light filling wall and a laminated beam prefabricated bottom beam which are integrally prefabricated, and the bottom of each shear wall is provided with a retraction part and matched with the corresponding light filling wall to form a step structure; during construction, the tops of the laminated beam prefabricated bottom beams corresponding to the light filling walls are poured and serve as first supporting connection parts, then the upper-layer combined wall is hoisted to the position overlapped with the upper portion of the lower-layer combined wall, the bottoms of the light filling walls of the upper-layer combined wall are placed on the first supporting connection parts, then stabilizing is conducted through oblique supporting, and pouring is conducted through second post-poured concrete after the perpendicularity is adjusted; and finally, the light filling walls and the first supporting connection parts are subjected to joint filling, and construction is completed. According to the construction method, the construction sequence is reasonable, the process is convenient, fast and efficient, and the joint connection quality is easy to control.

Description

technical field [0001] The invention relates to the field of prefabricated buildings, in particular to a construction method for interlayer connection nodes of combined prefabricated concrete walls. Background technique [0002] Prefabricated buildings refer to the production of some or all of the components and parts of the building in the prefabricated factory, and then transported to the construction site, using reliable connection methods and installation machinery to assemble the components to form a building with design and use functions. Compared with the construction of cast-in-place structures, prefabricated structures have the advantages of convenient construction, fast project progress, little impact on the surrounding environment, and easy guarantee of the quality of building components. The prefabricated concrete structure is of positive significance to promote the process of urban construction, improve project quality, promote energy conservation and emission r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/00E04B2/74E04B2/82E04B5/38E04B1/41
CPCE04B1/4121E04B2/00E04B2/74E04B2/82E04B5/38
Inventor 肖飞顾盛孙晋博林莉
Owner KUNSHAN CONSTRUCT ENG QUALITY TESTING CENT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products