Power market auxiliary service green certificate compensation method and system
A power market and auxiliary service technology, applied in the field of electric power market, can solve problems such as increased equipment failure rate, increased frequency regulation capacity and mileage, increased auxiliary service costs, etc., to solve unfair occupation, improve prediction accuracy, and promote fair development Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Such asfigure 1 As shown, the present invention provides a green certificate compensation method for auxiliary services in the electric power market, the steps are as follows:
[0045] Step 1: Obtain the officially submitted day-to-day forecast transaction power generation curve and the collected actual power generation curve of the day;
[0046] Step 2: Calculate the curve deviation according to the actual power generation curve of the day and the predicted transaction power generation curve data of the day;
[0047] Step 3: Calculate the corresponding number of green certificates according to the deviation of the curve, and compensate for the auxiliary services of the electricity market.
[0048] Step 1 includes:
[0049] First of all, it is necessary to obtain the forecast trading power generation curve of the day before the day officially submitted and the actual power generation curve of the day collected, and then perform subsequent calculations based on these tw...
Embodiment 2
[0059] Based on the same inventive concept, the present invention also provides a green certificate compensation system for power market auxiliary services, such as Figure 4 As shown, including: power generation data acquisition module, deviation calculation module and compensation module;
[0060] The power generation data acquisition module is used to obtain the officially submitted day-to-day predicted transaction power generation curve and the collected actual power generation curve of the day;
[0061] The deviation calculation module is used to calculate the curve deviation according to the actual power generation curve of the day and the predicted transaction power generation curve data of the day, and integrate the power at each moment to obtain the total integral deviation of the day;
[0062] The compensation module is used to calculate the corresponding number of green certificates according to the deviation amount, and compensate the auxiliary services of the elec...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com