Project quota pricing method and system
A quota and engineering technology, applied in the direction of instruments, data processing applications, business, etc., can solve the problem of low accuracy of engineering quota and price, and achieve the effect of good adjustment, efficiency improvement and correlation improvement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] The application will be described in further detail below in conjunction with the accompanying drawings.
[0053] In one embodiment, as figure 1 As shown, this application discloses a method for engineering fixed pricing, which specifically includes the following steps:
[0054] S10: Obtain an engineering price order, and obtain the location information of the site to be surveyed from the engineering price order.
[0055] In this embodiment, the engineering cost instruction refers to a message to start evaluating the construction cost of the building construction project. The location information of the site to be surveyed refers to the location of the construction site that needs to be surveyed on the spot.
[0056] Specifically, before the start of the construction project, the bidding information is initiated by the bidder, and the bidding tasks are carried out by each construction party. The position triggers the project price command, and after the project price...