Construction method of concrete pond dam
A construction method and concrete technology, applied in dams, water conservancy projects, sea area projects, etc., can solve problems such as poor anti-seepage performance of dam body and dam surface, increase connection stability, reduce waterproof performance, and increase anti-seepage effect Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] Contraction below Figure 1-3 Further detailed description of the present application.
[0040] The example of the present application discloses a construction method of a concrete pond dam.
[0041] Refer figure 1 The construction method of a concrete pond dam includes the following steps: S1: dam surface 100 pretreatment, first use the excavator to completely flattening the dam surface 100, so that the dam surface 100 is a tilted plane; the excavator is carried out on the dam surface 100 At the whole time, the dam surface 100 was constructed using the back of the excavator bucket, and the dam surface 100 was constructed using a tamping machine in the excavator. After the dam surface 100 is completed, a plurality of housing cavity 110 are opened on the dam surface 100, and the plurality of receiving cavity 110 are uniformly distributed on the dam surface 100, and the opening direction of each receiving cavity 110 is perpendicular to the dam. The plane setting of the surface...