[0043] In the following, the technical solutions in the present invention will be fully described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the present invention All other embodiments obtained by those skilled in the art without creative efforts, all belong to the protection scope of the present invention.
[0044] Figure 1-3 The schematic diagram of the MJS pile process is shown. In order to prevent the excessive loss of weekly friction resistance during the construction of the MJS pile around the pile foundation under the ground clearance ring, the surrounding of the bridge pile foundation is divided into 4 fan-shaped surfaces, and the construction sequence is diagonal. like Figure 4 As shown, adopting the form of sub-area and sub-period diagonal reinforcement is an effective means to control the deforma...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 