A prefabricated bridge suitable for efficient flame extinguishing of small forest fires and its application method
A forest fire and high-efficiency technology, applied in bridge applications, bridges, bridge construction, etc., can solve the problems that the fire extinguishing effect of manual and fire trucks is not the best, the height of the flame area is large, and achieves ingenious design, good safety performance, Guaranteed effect of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] like Figure 1 to Figure 5 As shown, a prefabricated bridge suitable for efficient flame extinguishing of small forest fires includes a prefabricated plate 5 and a control room 23 on the ground, and a prefabricated steel beam 1 and a water pump 24 are provided on the upper side of the prefabricated plate 5. The prefabricated steel beam 1 is provided with a lifting lug 101, one end of the prefabricated steel beam 1 is detachably and fixedly connected to the prefabricated plate 5, and the other end is detachably and fixedly connected to the control machine room 23; the prefabricated steel beam 1 includes an operation area, anchoring area, the operation area includes the first conveyor belt and the second conveyor belt arranged side by side; Two conveyor belts are connected; the lower side of the prefabricated steel beam 1 is fixedly connected with the prefabricated plate 5 through several prefabricated steel frames 28, and the prefabricated steel frames 28 are fixedly pro...
Embodiment 2
[0059] A method of using a prefabricated bridge suitable for efficient flame extinguishing of small forest fires, the forest fire warning signal and the fire flame area are at least 1000m away from the control room 23, and the other modules are not hoisted except the combination of prefabricated steel beam 1 and prefabricated steel frame 28 The completion of debugging is the preparatory work as an example, including the following steps:
[0060] S1: The crane hook quickly lifts the combination of the prefabricated steel beam 1 and the prefabricated steel frame 28 through the three-point connection lug 101, and then the mechanical operator completes the fixed connection between the concave fixed end 27 and the triangular prefabricated frame 102, and the connection between the ground anchor hole 107 and the prefabricated steel frame 28 Fixed connection of prefabricated panels 5 and inspection of installation quality.
[0061] S2: Connect the flame-retardant pipeline 9 to the wat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com