Modeling method of high-speed railway networked train operation scheme diagram
An operation plan and technology for high-speed railways, which are applied in the field of transportation and can solve the problems of overtaking trains without considering different starting and ending points, and inaccurate calculation of train travel time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0077] The present invention provides a modeling method for a high-speed railway networked train operation plan diagram, such as figure 1 shown, including:
[0078] Step 01: Select the high-speed railway network, including: all nodes and connecting lines on the train operation plan diagram;
[0079] Step 02: Construct decision variables and logical relationships of different train route nodes;
[0080] Step 03: According to the decision variable and logical relationship, construct the calculation formula of the whole train travel time;
[0081] Step 04: Construct preset constraints and objective functions related to the train operation plan diagram;
[0082] Step 05: Based on steps 03-04, build a train operation scheme diagram model, compile and solve the operation scheme diagram model based on the target software, and obtain a scheme diagram to be verified.
[0083] For the above steps 1-5, see the specific execution steps figure 2 .
[0084] In this embodiment, firstly...
Embodiment 2
[0087] On the basis of embodiment 1, select the high-speed railway network, including: in the process of all nodes and connecting lines on the train operation plan diagram, also include:
[0088] Define the node, and denote by s, and the set of the nodes is S, s∈S;
[0089] Define the line connection relationship between adjacent nodes of two different stations as interval e, namely Indicates slave node s k to node s k' The formed interval, including direction, the interval set is E;
[0090] Wherein, the node is the throat area of the station in the train operation plan diagram.
[0091] The beneficial effect of the above technical solution is: by determining the nodes and connecting lines, it is convenient to ensure the validity of obtaining basic information and provide a data basis for subsequent model building.
Embodiment 3
[0093] On the basis of any one of embodiments 1-2, in the process of constructing decision variables and logical relations of different train route nodes, it also includes:
[0094] Select the train l on the train operation plan diagram, the train set is L, l∈L;
[0095] Define the time when train l passes through node s as is a decision variable;
[0096] Define the i-th train l i with the jth train l j The context of the node s in the common path is For the decision variable, construct the description and The calculation formula of the logical relationship is as follows:
[0097]
[0098]
[0099] in, as the decision variable means train l i , train l j The moment of passing through node s, in minutes; Is the decision variable, the value is 0 or 1, when the train l i ahead of the train l j When passing through node s or two trains passing through node s at the same time, It is equal to 1, otherwise it is equal to 0; M is a known parameter and is a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



