Beidou GPS-based time synchronization system verification device and method

A system verification and GPS positioning technology, which is applied in the field of Beidou GPS-based time synchronization system verification devices, can solve the problems of low success rate of substation time synchronization system, etc.

Inactive Publication Date: 2021-09-14
HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD
View PDF9 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The present invention aims to overcome the problem of low success rate of substation time synchronization system fault elimination caused by the lack of synchronous clock source equipment in the prior art, and provides a time synchronization system verification device and method based on Beidou GPS, with a timing success rate of 100% %, excellent timing performance, meeting the substation timing performance requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Beidou GPS-based time synchronization system verification device and method
  • Beidou GPS-based time synchronization system verification device and method
  • Beidou GPS-based time synchronization system verification device and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0036] This embodiment provides a time synchronization system verification device based on Beidou GPS, such as figure 1It includes interconnected Beidou positioning and timing module 1, B code receiving, sending and photoelectric conversion module 2, liquid crystal display module 3 and liquid crystal display module 4.

[0037] Such as figure 2 As shown, the Beidou GPS positioning and timing module 1 includes a resistor R1, a positioning and timing chip U1, a light-emitting diode LED, a resistor R2, a resistor R3, a resistor R4, a diode D1, a boost chip U2, a capacitor C2, a capacitor C3, a capacitor C4, and a capacitor C5 , battery BAT and socket P1, power supply VCC3.3V are respectively connected to one end of resistor R1, the positive pole of diode D1, one end of capacitor C3, one end of capacitor C3, the VCC end of positioning timing chip U1 and the output end of step-down chip U2, and the other end of resistor R1 is connected to Connect the positive pole of the light-emi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a Beidou GPS-based time synchronization system verification device and method, which overcome the problem of low defect elimination success rate of a transformer substation time synchronization system caused by no synchronous clock source equipment in the prior art, and comprises a Beidou GPS positioning time service module, a B code receiving, transmitting and photoelectric conversion module, a liquid crystal display module and a lithium battery charging and boosting power supply module.The four modules are connected with one another. Beidou GPS time service performance testing, time synchronization input signal verification testing, time synchronization signal output testing, time service success rate calculation and verification success rate calculation are carried out, the time service success rate reaches 100%, the time service performance is excellent, and the requirement for the time service performance of a transformer substation can be met, and the defect elimination success rate is obviously improved.

Description

technical field [0001] The invention relates to the technical field of power grids, in particular to a time synchronization system verification device and method based on Beidou GPS. Background technique [0002] The power grid system is a time-related system. For the systematic analysis of power grid operation and accidents, circuit breakers, protection device actions, and time sequences of various events are required. A substation timing system that provides time sequences is essential. At present, there are 135 substations under the jurisdiction of State Grid Huzhou Power Supply Company, including 22 220kV substations, 91 110kV substations, and 22 35kV substations. Each substation is equipped with a substation timing system. [0003] The substation time synchronization system is very important. It performs time synchronization for equipment such as fault recorders, relay protection devices, measurement and control devices, and background monitoring systems, so that they c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G04R20/04G04R20/06
CPCG04R20/04G04R20/06
Inventor 周开运童大中丁昊高泓韩磊吴卫春祝丽娟
Owner HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products