Atlas construction and early warning method, equipment and medium
A construction method and technology of graphs, applied in the field of knowledge graphs, can solve problems such as thin functions, inability to dynamically capture, and inability to comprehensively measure the impact, and achieve the effect of accurate matter graphs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] figure 1 A schematic diagram of a map construction process provided by an embodiment of the present invention, the process includes the following steps:
[0042] S101: For each industry chain, obtain the map text used to construct the industry chain; from the map text, obtain entity information and information about the relationship between entities; create corresponding nodes according to the obtained entity information , and connect the corresponding nodes according to the information of the association relationship between the entities to construct the knowledge map of the industrial chain.
[0043] The map construction process provided by the embodiments of the present invention is applied to electronic devices, which may be smart devices such as PCs, smart home devices, or servers, where the smart home devices may be, for example, smart refrigerators, smart TVs, and other devices.
[0044] In order to accurately construct an event graph, electronic devices store g...
Embodiment 2
[0053] In order to accurately construct an event map, on the basis of the above-mentioned embodiments, in the embodiment of the present invention, according to the association relationship between the entities corresponding to the pre-saved industry chain, the knowledge map that connects the constructed industry chain has The nodes corresponding to the entities of the connection relationship include:
[0054] According to the association relationship between the entities corresponding to the pre-saved industry chain, determine the knowledge graph of the industry chain corresponding to the entity with the association relationship;
[0055] According to the association relationship between the entities, the nodes corresponding to the corresponding entities in the determined knowledge map of the industrial chain are connected.
[0056] In order to accurately construct an event map, in the embodiment of the present invention, the electronic device stores the association relationsh...
Embodiment 3
[0069] In order to accurately construct the event map, on the basis of the above-mentioned embodiments, in the embodiment of the present invention, the event evolution law is constructed in the following manner:
[0070] Extracting the second event contained in the collected public opinion information, the third event corresponding to the cause, and the fourth event corresponding to the result;
[0071] If any of the third node corresponding to the second event, the fourth node corresponding to the third event, and the fifth node corresponding to the fourth event are not included in the intermediate event evolution law to be constructed, then create the corresponding node;
[0072] If the intermediate event evolution law does not include the connection relationship from the fourth node to the third node, or does not include the connection relationship from the third node to the fifth node, then establish the fourth node A connection relationship pointing to the third node, or...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com