A positioning device for diamond-shaped split-tube cable saddles for cable-stayed bridges with low towers
A low-tower cable-stayed bridge and positioning device technology, applied to cable-stayed bridges, bridge forms, bridges, etc., can solve the difficulty in controlling the displacement of the tower crane, the low installation accuracy of the split pipe, and the impact on the force of the subsequent cable-stayed bridge, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] refer to figure 1, a rhombic cable-stayed bridge saddle positioning device for a cable-stayed bridge with low towers, comprising a rigid frame 2 erected on the top of the cable tower 1, a branch tube 11 is erected inside the rigid frame 2, and the top of the rigid frame 2 is also provided with a Two sets of lifting components for adjusting the vertical position of the splitting tube 11, the lifting component is connected with the splitting tube 11; the rigid skeleton 2 is welded with three sets of adjusting rods 4 for adjusting the lateral position of the splitting tube 11, the adjusting rod 4. The end far away from the rigid frame 2 is in contact with the wire splitting tube 11; the rigid frame 2 is also welded with three sets of locking parts for limiting the movement of the splitting tube 11, and the three sets of snapping parts are located below the splitting tube 11. The clamping parts of the groups are evenly distributed along the extending direction of the thread...
Embodiment 2
[0045] refer to figure 2 and image 3 The difference between the second embodiment and the first embodiment is that a support rod 7 can be detachably connected between the adjacent vertical rods 21 on the same side, the support rod 7 is vertically arranged, and the top of the support rod 7 is fixedly connected with a The channel steel 71 of the connecting rod 31, the opening of the channel steel 71 is set up, and the channel steel 71 and the support 7 are T-shaped; the length direction of the channel steel 71 is perpendicular to the length direction of the support rod 7; the connecting rod 31 with welding is placed Being inside the channel steel 71, it is convenient for the construction personnel to directly weld the connecting rod 31, which is beneficial to reduce the situation that the construction personnel need to hold the connecting rod 31 while welding.
[0046] refer to image 3 and Figure 4 , the opposite sides of the support rod 7 are slidingly inserted with abut...