Whole plant equipment scheduling device based on edge control and scheduling method thereof
An edge control and scheduling device technology, applied in fire alarms, televisions, instruments, etc., can solve the problems of single function, complex program, affecting scheduling efficiency, etc., and achieve the effect of diversified functions, clear layers and high security.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.
[0022] A whole plant equipment scheduling device based on edge control, including a console, the console is connected to an edge controller through a signal line, and the edge controller is respectively connected to a positioning system and a video linkage system through a signal line, the positioning system Personnel, field equipment and means of transportation are respectively connected through signal lines. The personnel include name, department and type of work, and the department is set with a number. The field equipment includes name and status, and the name is set with a model. The means of transportation includes Name, status and power, and the name is set wit...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
