Subway station active control grouting lifting method for close-fitting underpass of existing station
A technology for grouting lifting and existing stations, applied in underwater structures, infrastructure tests, water conservancy projects, etc., can solve problems such as the influence of existing stations, settlement values exceeding control values, etc., and achieve the effect of simple operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040]The newly-built subway station in the embodiment of the present invention adopts the pile method of eight pilot holes for construction, and the distance between the roof of the newly-built station and the floor of the existing station is 0.5m.
[0041] Such as figure 1 As shown, the active control grouting lifting method of the tunnel pile method in the embodiment of the present invention to construct the subway station close to the existing station and pass through the existing station includes the following steps:
[0042] S1: Construction preparation: Before construction, according to the actual site data, the position of the pilot tunnel, the relative position of the existing station and the new station, the position of the deformation joint of the existing station, and the main impact area of the close-fitting underpass construction on the existing station, the note The grouting lifting scheme. The grouting lifting scheme in this embodiment includes lifting three ...