[0040]The newly built subway station in the embodiment of the present invention adopts the eight-guided-hole pile method for construction, and the distance between the top plate of the new station and the bottom plate of the existing station is 0.5m.
[0041] like figure 1 As shown in the embodiment of the present invention, the method for actively controlling the grouting lifting method for constructing a subway station by the hole-piling method and passing through the existing station closely, including the following steps:
[0042] S1: Construction preparation: Before construction, according to the actual site data, the position of the pilot hole, the relative position of the existing station and the new station, the position of the deformation joint of the existing station, and the main impact area of the close-fitting underpass construction on the existing station, the notes are compiled. The grouting lifting scheme. In this embodiment, the grouting lifting scheme inclu...