Energy consumption scheme recommendation system based on intelligent contract and artificial intelligence fusion technology
An artificial intelligence and smart contract technology, applied in data processing applications, instruments, resources, etc., can solve problems such as cheating, favoritism, time-consuming and laborious, and save time and energy, reduce favoritism and cheating.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] The data upload review unit will use the Internet on the computer to search, inquire and compare the specific time, completion and authenticity of the items described in the employee's resume, and send the results to the display module for display;
[0037] The work experience value analysis unit will use the artificial intelligence system to search and inquire on the Internet to find out the value brought about by the employees' participation; among them, the value is divided into material value and non-material value, and the material value can be the generated Direct or indirect income from movable and immovable property, immaterial value can be antiques and other products with short-term or long-term commercial value, and thus generate a referral score;
[0038] The job correlation evaluation unit will evaluate the correlation between the employee's participation and the company's business scope, and indicate the evaluation result by a percentage, and divide the eval...
Embodiment 2
[0040] The attendance assessment unit during the probationary period will record the attendance of each day of the employee during the probationary period, and calculate every 30 days as a cycle to obtain the attendance rate. Among them, the attendance rate above 90% is rated as excellent, 82 %-90% is qualified, and below 82% is unqualified;
[0041] The attendance assessment unit after becoming a regular employee will record the attendance of each day after the employee becomes a regular employee, and calculate the attendance rate of the current month at the end of each month (if the date covered by the assessment coincides with the date of the probationary period, it will overwrite the date of the probationary period. date, the date that is about to coincide is also calculated as the date after the regularization), similarly, those with an attendance rate of more than 90% are rated as excellent, those with an attendance rate of 82%-90% are good, and those with an attendance r...
Embodiment 3
[0043]The project completion efficiency calculation unit will collect the efficiency of each project completed by the employee after he becomes a full-time employee. This unit will search the data through the database in the enterprise to obtain the estimated completion time of the project after it is formulated and the actual time consumed by the employee to complete the project. The duration of the project is calculated by subtracting the expected completion time from the consumed time, and then dividing by the estimated completion time to get a percentage number. If the number is positive, the completion efficiency is rated as low, and the larger the absolute value, the higher the efficiency. Low, if the number is negative, the evaluation of completion efficiency is high, and the greater the absolute value, the higher the efficiency, and thus a recommendation score is generated;
[0044] The expense evaluation unit will count and accumulate all the expenses drawn from the en...