Supercharge Your Innovation With Domain-Expert AI Agents!

Railway engineering cost management system

A railway engineering and management system technology, applied in data processing applications, instruments, commerce, etc., can solve the problems of increasing difficulty in monitoring the construction process of railway engineering, reducing the accuracy of analysis results, and large construction space, so as to achieve dynamic More accurate grasp, improved dynamic data monitoring, and quality assurance effects

Active Publication Date: 2021-12-07
ZHENGZHOU RAILWAY VOCATIONAL & TECH COLLEGE
View PDF13 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The implementation process of railway projects generally has time and space characteristics that take a long time and the construction space is large. These characteristics will lead to more factors that cause errors in the process of railway project cost analysis, resulting in the construction of railway projects. Due to the influence of uncontrollable factors in time and space on the algorithm analysis of project cost, the data analysis of railway project cost is in a dynamic process. For railway project in different time stages The cost that has already been spent is also a process of dynamic change, and is affected by various errors at the same time, which reduces the accuracy of the analysis results. To avoid the influence of construction decision-making caused by the errors of various influencing factors, a railway engineering cost management system is proposed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Railway engineering cost management system
  • Railway engineering cost management system
  • Railway engineering cost management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] Regarding the aforementioned and other technical contents, features and effects of the present invention, refer to the appended Figure 1 to Figure 4 It will be apparent from the detailed description of the embodiments. The structural contents mentioned in the following embodiments are all based on the accompanying drawings of the description.

[0037] A railway engineering cost management system, including a data acquisition module, a cloud storage module, a data analysis module, a supervision module, and an adjustment module, the data analysis module includes a dynamic management module, an error analysis module, and a data preprocessing module, and the data analysis module utilizes data processing The model analyzes the construction data collected by the data collection module to obtain data analysis results, the adjustment module adjusts the construction process according to the data analysis results, the cloud storage module classifies and stores the construction d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a railway engineering cost management system, which comprises a data acquisition module, a cloud storage module, a data analysis module, a supervision module and an adjustment module, and is characterized in that the data acquisition module is used for performing data acquisition on a railway construction process and storing obtained construction data in the cloud storage module; a dynamic management module of the data analysis module establishes a decision objective function according to the construction data, and then performs analysis and decision of the dynamic data according to the decision objective function so as to realize the effect of dynamically monitoring the construction process and the data; an error analysis module is used for establishing an error analysis model for the construction data to obtain a time influence error and a space influence error, and obtaining an error analysis result according to the time influence error and the space influence error, so that the accuracy of dynamic data analysis in the railway construction process is improved through error analysis; dynamic management of the railway construction process is enhanced, and material loss and waste of human resources caused by wrong decisions are avoided.

Description

technical field [0001] The invention relates to the technical field of engineering cost, in particular to a railway engineering cost management system. Background technique [0002] The project cost refers to the construction price of the project, which is all the expenses required for a project construction. The technical personnel conduct project cost budget and check according to the project list, budget quota, etc., in order to understand the real situation of project implementation and the total cost of the project. Supervision, in the face of constant changes in actual conditions and continuous updating of data, informatization and dynamic management of construction costs during the construction phase is crucial. The BIM technology that already exists in the existing technology conducts comprehensive monitoring of railway projects, but Due to the uneven technical level of construction personnel, for construction personnel with low technical level, the level of a railwa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q30/02
CPCG06Q10/0631G06Q10/067G06Q10/103G06Q30/0283Y02P90/30
Inventor 苏丹娜孙洪硕李帆樊苗李东浩杨柳朱永超郭营飞
Owner ZHENGZHOU RAILWAY VOCATIONAL & TECH COLLEGE
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More