Fabricated ceramic tile wall surface
A prefabricated and ceramic tile technology, applied in covering/lining, construction, building construction, etc., can solve the problems of easy damage, complex structure, and difficulty in popularization and application of telescopic frames
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] As shown in the figure, an assembled ceramic tile wall includes anchors 1 , bolts 2 , bolt boxes 3 , prefabricated panels 4 and decorative tiles 5 .
[0037] The anchor 1 includes an anchor panel 6 and several spiral tubes 7, the anchor panel 6 is provided with several holes, the inner wall of the spiral tube 7 is provided with internal threads, and the several spiral tubes 7 are vertically fixed respectively Installed on each hole of the anchor panel 6 to form an anchor 1; when in use, the anchor 1 is preinstalled in the wall 8, and the anchor panel 6 is exposed on the wall and is flush with the surface of the wall 8; Embodiment The anchor panel 6 is made of long steel strips, and several holes arranged in a single row are drilled on the strip steel strips, and a spiral tube 7 perpendicular to the anchor panel 6 is fixedly installed in each hole. After installation, the distance between two adjacent spiral tubes is 30cm; after the anchor 1 is installed on the wall 8, the...
Embodiment 2
[0045] The construction method for the above-mentioned prefabricated ceramic tile wall includes the following steps.
[0046] (1) The anchors 1 fixedly installed with the spiral tubes 7 arranged in a single row are pre-installed in the wall 8, and the anchor panel 6 is exposed on the surface of the wall 8 and is flush with the surface of the wall 8; Several anchor pieces 1 arranged up and down in a horizontal row are pre-installed on the top.
[0047] (2) Screw the bolt 2 into the anchor piece 1, and screw the stud 11 on the bolt 2 into the spiral tube 7, so that the square stacked cone column 10 and the nut 9 on the bolt 2 are exposed outside the anchor panel 6, and Make a pair of side faces of the square stacked cone column 10 in a vertical state, and the other pair of side faces in a horizontal state.
[0048] (3) Make the prefabricated panel 4, and make the prefabricated panel 4 into a cuboid shape, preinstall the buckle box 3 in the prefabricated panel 4 during productio...
PUM
| Property | Measurement | Unit |
|---|---|---|
| length | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
| height | aaaaa | aaaaa |
Abstract
Description
Claims