A technology for complex fractures and fracturing, which is applied in staged multi-cluster fracturing of horizontal wells to realize the effective support of complex fractures in fracturing, and can solve the problems of limited activation range of natural fractures and achieve effective communication and plugging effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0070] A shale gas well in southwestern Sichuan has a vertical depth of 2180m, a sounding depth of 3980m, and a horizontal section length of 1512m. Follow the steps below to retrofit:
[0071] (1) Coiled tubing is used to carry a perforating gun to complete the first stage of perforation. Among them, the perforation length is 3m, the hole density is 16 holes / m, and there are 3 clusters in total.
[0072] (2) After the first stage of perforation operation, after the first stage of perforation operation, the 3 A total of 10m of pretreatment acid is injected per minute 3 . Subsequent increase in displacement to 6m 3 / min Inject low viscosity slippery water 45m 3 Replace the acid, and finally reduce the displacement to 2m 3 / min inject low viscosity slippery water 5m 3 Replace the acid to ensure that the acid fully reacts with the rock.
[0073] (3) Low-viscosity slick water is used to make the main joint, and the quick lifting displacement is up to 16m 3 / min, the viscos...
Embodiment 2
[0086] A shale gas well in southwestern Sichuan has a vertical depth of 2080m, a sounding depth of 4380m, and a horizontal section length of 1512m. Follow the steps below to retrofit:
[0087] (1) Coiled tubing is used to carry a perforating gun to complete the first stage of perforation. Among them, the perforation length is 3m, the hole density is 16 holes / m, and there are 3 clusters in total.
[0088] (2) After the first stage of perforation operation, after the first stage of perforation operation, the 3 A total of 10m of pretreatment acid is injected per minute 3 . Subsequent increase in displacement to 6m 3 / min Inject low viscosity slippery water 45m 3 Replace the acid, and finally reduce the displacement to 2m 3 / min inject low viscosity slippery water 5m 3 Replace the acid to ensure that the acid fully reacts with the rock.
[0089] (3) Low-viscosity slick water is used to make the main joint, and the quick lifting displacement is up to 16m 3 / min, the viscos...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Apparent density | aaaaa | aaaaa |
| Viscosity | aaaaa | aaaaa |
| Viscosity | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 