Adjustable rapid slurry laying device for wall building and using method
An adjustable and grouting technology, which is applied in the processing of building materials, construction, building construction, etc., can solve the problems of substandard mortar joints in the wall, slow masonry speed, and insufficient overall strength.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Such as Figure 1 to Figure 6 As shown, it is an embodiment of the present invention, an adjustable and fast grouting device for wall masonry, including a main frame 1, and a corner groove is arranged under the main frame 1 and is suitable for erecting on the masonry layer 2, the main frame 1 is provided with a cavity, which is suitable for laying grout on the masonry layer 2, and the main frame 1 is provided with a discharge port 3, and a scraper 4 and a vibrating part are installed on the discharge port 3 5. The scraper part 4 is suitable for smoothing the mortar, and the vibrating part 5 is suitable for vibrating the mortar evenly;
[0042] A sloping plate 6 is arranged in the cavity, and the sloping plate 6 is suitable for inclining downward toward the discharge port 3 , and the sloping plate 6 arranged downward allows the mortar to move toward the discharge port 3 .
[0043] The main frame 1 is respectively provided with a transverse plate 7 and a side plate 8, th...
Embodiment 2
[0054] Such as Figure 7 and Figure 8 As shown, in order to allow the main body frame 1 to move laterally along the masonry layer 2, a second fixed mount 28 is installed outside the main body frame 1, and a motor 27 is installed in the second fixed mount 28, and the second fixed mount 28 and the motor 27 The fuselage is fixedly connected, the output end of the motor 27 is equipped with a connecting shaft 29, the connecting shaft 29 is suitable for running through the main body frame 1 and connecting bearings are installed at both ends, the connecting shaft 29 bearings are installed in the main body frame 1, and the connecting shaft 29 is suitable for the main frame 1 Rotate on frame 1, drive wheel 30 is installed on connecting shaft 29, and drive wheel 30 is fixedly connected with connecting shaft 29;
[0055] The two ends of masonry layer 2 are equipped with fixed plate 31, and fixed plate 31 is detachably connected with body of masonry wall, and transmission chain 32 is in...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


