Prestressed concrete bridge wet joint concrete and bridge deck pavement concrete prestressing method
A bridge deck pavement and prestressing technology, applied to bridges, bridge parts, bridge materials, etc., can solve problems that affect the quality and service life of bridges, cracks, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Embodiment Known conditions: the width of the wet joint concrete is 100 cm, the thickness of the bridge deck pavement concrete is 16 cm, and the prestressed concrete girder is pre-embedded with connecting ribs between the wet joint concrete and the bridge deck pavement concrete.
[0041] A method for prestressing the wet joint concrete of a prestressed concrete bridge and the bridge deck pavement concrete, the specific method is:
[0042] 1. Make anti-collision belt
[0043] Due to the heavy weight of the anti-collision belt, it has a great influence on the camber value of the side beam, which involves the follow-up process, so the anti-collision belt should be made first after the prestressed concrete main girder is installed.
[0044] The anti-collision belt shall be constructed according to the design drawings, and the construction method, technology and quality requirements shall be implemented in accordance with the relevant provisions of (JTG / T F50-2011) "Technica...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
