High-voltage power distribution network transfer optimization method considering wiring units and power transmission blockage
A technology of wiring unit and optimization method, applied in the electric power field, can solve the problems of power supply recovery, 220kV station overload, voltage loss, etc., and achieve the effect of ensuring safe and stable operation and eliminating the overload of the main transformer.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] This embodiment 1 provides a high-voltage distribution network transfer optimization method that takes into account wiring units and transmission congestion, such as figure 1 shown, including the following steps:
[0037] S1, obtain the number of line switches of the high-voltage distribution network after the failure of the main substation, and construct the power supply recovery sub-model of the high-voltage distribution network after the failure of the main substation according to the number of line switches;
[0038] S2, according to the switch state of the high-voltage distribution network line and the reverse charging of the high-voltage distribution network busbar, establish the sub-model of the high-voltage distribution network transfer supply optimization sub-model with the main substation overloaded;
[0039] S3, according to the power supply restoration sub-model and the transfer optimization sub-model of the high-voltage distribution network, jointly establi...
Embodiment 2
[0053] In this second embodiment, on the basis of the first embodiment, the load transfer test and analysis of an actual 110kV urban high-voltage distribution network are carried out with specific implementation instructions. exist image 3 Among them, Jinniu, Xiner Village, Tangkan Street, Anshun Bridge, Wuhou, and Shiyang are all 5 2×180MVA 220kV stations, and the rest are 110kV stations.
[0054] exist image 3 Among them, it covers 6 types of typical 110kV wiring methods, such as the direct supply wiring method of 110kV Oasis Station; The one-station series connection mode formed by the same station; the T-shaped inter-station series connection mode formed by the 110kV Zhengfu Street Station and the West First Ring Station; the T-shaped system formed by the 110kV Jiuliti Station and No. 1 and 2 main transformers of the Xingchen Station The same-station series connection mode, in which the 110kV Xingchen Station No. 3 main transformer is powered by the T-connection line; ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com