Arch dam hub BIM rapid modeling method based on 3DEXPERIENCE Platform

A modeling method, a pivotal technology, applied in geometric CAD, special data processing applications, other database retrieval, etc., can solve problems such as rapid modeling, rapid display, rapid modification and reuse, etc., to achieve rapid modification and reuse, improve Effects on Modeling Efficiency

Pending Publication Date: 2022-01-18
POWERCHINA CHENGDU ENG
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] The technical problem solved by the present invention is to provide a 3DEXPERIENCE Platform-based BIM rapid modeling method for arch dam hubs, which solves the problem that rapid modeling, rapid display, and rapid modification and reuse cannot be realized in the stage of decision-making comparison and selection of project proposals or early plans The problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Arch dam hub BIM rapid modeling method based on 3DEXPERIENCE Platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The present invention is based on the 3DEXPERIENCE Platform's BIM rapid modeling method for arch dam hubs, as shown in the attached figure 1 shown, including the following steps:

[0021] S01. Import the terrain elevation point data of the hub area into 3DEXPERIENCE Platform, generate the topographic PHM surface or triangular mesh surface of the hub area, and create a 3D engineering geological model of the hub area;

[0022] S02. Create upstream control points and downstream control points of the reference arch dam hub in the three-dimensional model;

[0023] Specifically, the coordinates of the upstream control point and the downstream control point are geodetic coordinates.

[0024] S03. Create UDF knowledge engineering templates for different structures of the arch dam hub, the input parameters of the UDF knowledge engineering templates are associated with the coordinates of the upstream control point and the downstream control point;

[0025] Specifically, the UDF...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an arch dam hub BIM rapid modeling method based on 3DEXPERIENCE Platform, and relates to the field of water conservancy and hydropower construction engineering. UDF knowledge engineering templates of different structures of an arch dam hub are created based on coordinates of a upstream control point and a downstream control point, and preassembly is carried out to obtain a datum arch dam hub part template; the datum arch dam hub part template is utilized to change the coordinates of the upstream control point and the downstream control point; corresponding characteristic parameters of the datum arch dam hub part template are adjusted by combining the characteristic parameters of the needed arch dam hub, and a needed arch dam hub model is rapidly generated, so that the problem that rapid modeling, rapid display and rapid repairing and reusing cannot be achieved in the project proposal or planning early-stage scheme decision comparison and selection stage is solved; and the method is suitable for water conservancy and hydropower engineering construction.

Description

technical field [0001] The invention relates to the field of water conservancy and hydropower construction engineering, in particular to a BIM rapid modeling method for an arch dam hub based on 3DEXPERIENCE Platform. Background technique [0002] 3DEXPERIENCE Platform is a collaborative environment platform that can provide software solutions for various fields; it can meet the collaboration among engineers with different roles and solve industry problems and challenges. [0003] An arch dam refers to a retaining dam that bends upstream on a plane, is curved, and can transmit part of the horizontal load to both banks. It is a space shell structure. Usually, the arch dam hub includes barrage body, flood discharge structure of dam body, energy dissipation structure and power generation structure behind the dam. [0004] BIM is the abbreviation of Building Information Modeling (Building Information Modeling), which refers to the digital expression of physical and functional ch...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13G06F30/20G06F16/906
CPCG06F30/13G06F30/20G06F16/906
Inventor 李金洋裴广超魏刚文
Owner POWERCHINA CHENGDU ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products