Graded starting device for gas-lift ball gas-lift producing well
A technology for starting devices and oil production wells, which is applied in the direction of production fluid, earthwork drilling, wellbore/well components, etc., which can solve the problems of low gas lift efficiency and high energy consumption, and achieve high efficiency and fast liquid drainage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as Figure 1-2 As shown, this embodiment provides a type I staged start-up device for gas-lift ball gas-lift production wells, including a manifold 1 and several gas-lift valves 2, and several gas-lift valves 2 along the length of the manifold 1 The direction is set, the tri-manifold 1 is Y-shaped, including the delivery tube 11, the lift pipe 12 and the tail pipe 13, and the gas lift valve 2 is H-shaped, including the first channel 21, the second channel 22 and the third channel 23, The first channel 21 communicates with the delivery tube 11, the second channel 22 communicates with the lifting tube 12, and the gas lift valve 2 at the tailpipe 13 of the manifold 1 communicates with the delivery tube 11 at one end of the first channel 21 , the other end is sealed, one end of the second channel 22 communicates with the lift pipe 12, the other end communicates with the tail pipe 13, the third channel 23 communicates the first channel 21 with the second channel 22, and...
Embodiment 2
[0048] Such as image 3 As shown, as an improvement of Embodiment 1, this embodiment provides a type II staged start-up device for gas-lift ball gas-lift production wells, and the rest of the features are the same as in Embodiment 1, the difference is that The spring 44 is replaced by an electric telescopic rod 47, and a first pressure sensor 5 and a first PLC controller 6 are respectively arranged on the inner side wall of the second channel 22, and the signal output end of the first pressure sensor 5 is connected with the first PLC control The signal input end of device 6 is connected, and the signal output end of the first PLC controller 6 is connected with the signal input end of electric telescopic rod 47, and the electric power of electric telescopic rod 47, the first pressure sensor 5 and the first PLC controller 6 are all controlled by Downhole cable provided.
[0049] The type II staged start-up device for gas-lift oil production wells provided by this embodiment ado...
Embodiment 3
[0051] Such as Figure 4 As shown, as an improvement of Embodiment 1, this embodiment provides a type III staged start-up device for gas lift production wells with gas lift balls, and the rest of the features are the same as in Embodiment 1, the difference is that There is no sealed cabin 4, and the plate-shaped gate 3 is replaced by a cylindrical gate 7. The cylindrical gate 7 includes a valve core 71 and a valve housing 72 arranged coaxially. The valve core 71 can rotate around the axis in the valve housing 72. The valve The outer wall of the core 71 fits with the inner wall of the valve housing 72, the valve core 71 is provided with a second through hole 711 in the direction perpendicular to the axis, and the two sides of the valve housing 72 are symmetrically provided with through grooves 721, and the through grooves 721 and the first The two through holes 711 are matched. In addition, a second pressure sensor 8 and a second PLC controller 9 are respectively arranged on t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


