Vacuum prepressing well point dewatering construction method
A technology of well point precipitation and construction method, which is applied in infrastructure engineering, soil protection, construction, etc., can solve the problem of large labor consumption, and achieve the effect of reducing labor, facilitating laying, and reducing labor costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] The application will be described in further detail below in conjunction with the accompanying drawings.
[0045] The embodiment of the present application discloses a construction method for vacuum preloading well point dewatering. refer to figure 1 , 2 , the vacuum preloading well point dewatering construction method comprises the following steps:
[0046] Step 1: laying sand cushion;
[0047] Step 2: Install the plastic drainage board;
[0048] Step 3: Embedding the vacuum distribution pipe;
[0049] Step 4: laying the sealing film 6, and adopting a film covering device to lay the sealing film 6;
[0050] Step 5: Install the jet vacuum pump;
[0051] Step 6: Vacuum;
[0052] Wherein, the laminating device in step 4 includes a laminating frame 1 , and the laminating frame 1 includes a laminating plate 2 , a front pressing roller 3 , a rear pressing roller 4 and a film roll 5 . The film-coated board 2 has a rectangular structure, the front pressure roller 3 is ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


