BIM-based Fabricated concrete building design and construction method

A technology for concrete construction and construction methods, which is applied in the directions of cooperating devices, calculations, computer parts, etc., can solve the problems of poor matching coordination, low construction efficiency, slow construction progress, etc., so as to ensure construction efficiency and avoid construction safety accidents. , The effect of facilitating service and maintenance management

Pending Publication Date: 2022-02-11
CHINA CONSTR EIGHTH ENG DIV
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve the above technical problems such as poor coordination between prefabricated component management and construction process, low construction efficiency and slow construction progress in the prefabricated building process, the present invention provides a BIM-based prefabricated concrete building design and construction method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based Fabricated concrete building design and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] This specific embodiment is only an explanation of the present invention, and it is not a limitation of the present invention. Those skilled in the art can make modifications to this embodiment without creative contribution as required after reading this specification, but as long as they are within the rights of the present invention All claims are protected by patent law.

[0052] A BIM-based prefabricated concrete building design and construction method, characterized in that it includes the following steps: S1, determining the construction project plan;

[0053] S101, construction project research and planning, determine the research direction of construction technology;

[0054] Investigate the detailed information of the construction project, according to the optimization of the prefabricated building design, follow the design principles of less specifications, more combinations and modularization, and respond to the needs of various professional perspectives, and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a BIM-based fabricated concrete building design and construction method, which comprises the following steps: investigating and planning a construction project, and determining a research direction of a construction technology; demonstrating the feasibility of the construction scheme, and defining the construction scheme; establishing a full-life-cycle BIM model library and a full-life-cycle management platform of the project assembly type building based on a BIM informatization technology; managing and controlling the production, transportation and quality inspection and acceptance processes of the fabricated components; performing construction simulation and construction process management based on the full life cycle management platform; establishing an operation and maintenance management system based on the full-life-cycle management platform, and designing a maintenance management module; the whole process of designing, manufacturing, supervising, transporting, assembling and the like of the concrete member is matched with the construction process in real time through the full-life-cycle management platform, all links are rapidly coordinated, the construction quality is strictly controlled, the construction progress is accurately reflected in real time, and the construction efficiency is ensured.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a BIM-based prefabricated concrete building design and construction method. Background technique [0002] Prefabricated buildings refer to buildings built by prefabricated components through reliable connections. The advantages of this kind of building are that they are fast in construction, less restricted by climatic conditions, save labor and improve the quality of construction. The construction of houses can be done in batches like machine production. Therefore, the proportion of prefabricated buildings in the construction industry is also increasing. [0003] However, there are some problems in the construction process of the existing prefabricated buildings. Due to the huge amount of construction work of the prefabricated buildings, the design, production, stacking, assembly and operation and maintenance of the components used in the prefabricated buildings ca...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06K19/06G06K17/00
CPCG06F30/13G06K19/06037G06K17/0025
Inventor 郭鑫雨张磊张津铭张生韩德永任鹏
Owner CHINA CONSTR EIGHTH ENG DIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products