Permanent and temporary combined type ground anchor and building method thereof
A perpetually combined and combined technology, used in construction, infrastructure engineering, sheet pile walls, etc., can solve problems such as difficulty in setting ground anchors, consuming a lot of manpower, material resources and time, and narrow working surface, and achieve the overall structure. The effect of stability, shortening construction period and saving construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Such as Figure 1-Figure 9 As shown, a combined ground anchor of a permanent combination in the present embodiment is set as an example in the construction of a bridge in a mountainous area. The combined ground anchor includes an anchor structure 1 and a number of prestressed anchor cables 2, such as Figure 4 As shown, the anchorage structure 1 includes a bridge pile foundation 11 and a cap 12. The cap 12 is arranged on the top of the pile foundation 11 and can directly bear the upper bridge pier. The pile foundation 11 and the cap 12 are both reinforced concrete structural members, and The steel bars are connected to each other. During the binding process of the steel cages of the pile foundation 11 and the cap 12, the embedded pipe fittings 3, the embedded rods 4 and the embedded plates 5 are located on the anchorage structure 1 close to the hoisting cables 6. On one side of the prestressed anchor cable 2, one end of the prestressed anchor cable 2 passes through the ...
Embodiment 2
[0053] A method for establishing a combined ground anchor that is permanently combined as in embodiment 1 comprises the following steps:
[0054] S1: According to the hoisting weight, calculate the tensile force borne by the anchorage structure, and obtain the number of anchor ends of the hoisting cable 6 on the anchorage structure 1 .
[0055] Specifically, the hoisting weight can be obtained according to the components to be hoisted in the project construction, according to the design drawings and experience before construction, and then the number of hoisting ropes 6 can be obtained according to the hoisting weight, and the hoisting cable 6 can be used to cooperate with the hoisting. The tension angle of the cable 6 is subjected to stress analysis to obtain the stress situation of the anchorage structure 1 during use.
[0056] S2: Combined with S1, according to the rated tension value of a single prestressed anchor cable 2, the number of anchoring ends of the prestressed an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com