Resource pushing method and system, terminal equipment and readable storage medium
A resource and resource object technology, applied in the database field, can solve problems such as insufficient R&D strength, decoupling of technology R&D, and difficulty in teacher resources, and achieve the effect of saving labor and time costs and improving resource search efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] figure 1 Shown is the first flow chart of the resource pushing method in the embodiment of the present application. Exemplarily, the resource push method includes:
[0056] In step S100, the R&D requirements of the enterprise and the teacher information of the university are obtained respectively.
[0057] In general, enterprises often encounter various technical problems that need to be solved in production, for example, it can be the research and development of new products, technical fault resolution on the actual production line, performance optimization, etc., and the solution of these technical problems is the enterprise corresponding research and development needs.
[0058] In one embodiment, for the research and development needs of the enterprise, the corresponding scientific and technological terms can be extracted from the actual needs, and stored in the form of a list or an array, such as recorded as list1 {keyword1, keyword2, ...}, so that the computer a...
Embodiment 2
[0108] Please refer to Figure 5 , based on the method of Embodiment 1 above, this embodiment proposes a resource push system 100. Exemplarily, the resource push system 100 includes the following major modules:
[0109] The resource acquisition module 110 is used to obtain the research and development needs of enterprises and the teacher information of colleges and universities respectively. The research and development needs include at least one demand keyword, and the teacher information of each teacher includes at least four resource objects;
[0110] The resource matching module 120 is used to obtain the matching score of each resource object of each teacher according to each requirement keyword in the research and development requirements and each resource object of each teacher;
[0111] The matching scoring module 130 is used to assign weights to each resource object of the corresponding teacher, and use the weight value and matching score of each resource object to cal...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


