Shield receiving method in subway construction
A receiving method and a technology in construction, which are applied in the direction of earth cube drilling, mining equipment, tunnels, etc., can solve the problems of difficult operation, high position accuracy requirements of shield machines, and low safety, and achieve low operation difficulty and easy implementation Application, guaranteed precision effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0021] Such as figure 1 As shown, the shield receiving method in the subway construction of the present embodiment includes the following steps:
[0022] (S1) Construction of the receiving well for receiving the shield machine;
[0023] (S2) Before the shield machine reaches the receiving well, set a monitoring section along the designed tunneling path of the shield machine. The monitoring section is connected to the receiving well and the length is not less than 50m. The monitoring point of the attitude of the shield machine, and the reinforcement treatment of the soil at the receiving end of the receiving shaft;
[0024] (S3) After the shield machine is excavated to the monitoring section, adjust the attitude of the shield machine once for each preset length of excavation, so that the excavation direction of the shield machine is ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Length | aaaaa | aaaaa |
Abstract
Description
Claims