Tensile testing machine and method for controlling tensile testing machine
A technique of tensile testing and control method, applied in the direction of using repetitive force/pulsation force to test the strength of materials, using stable tension/pressure to test the strength of materials, measuring devices, etc. problem, to achieve the effect of easy correlation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 approach
[0134] Next, refer to Figure 7 and Figure 8 The processing of the control unit 51 in the first embodiment will be described in detail.
[0135] In the first embodiment, the time when the striking structure 60 applies the striking force FD to the testing machine body 2 is before the high-speed tensile testing machine 1 executes the tensile test. That is, the determination unit 513 determines the timing at which the striking structure 60 applies the striking force FD to the testing machine body 2 before the high-speed tensile testing machine 1 executes the tensile test.
[0136] The process of determining the timing of the impact force FD given to the testing machine body 2 by the determination unit 513 is Figure 8 The processing of step S101 of the shown flowchart is executed before the start point of time.
[0137] Figure 7 It is a time chart showing an example of processing of the control unit 51 in the first embodiment.
[0138] Figure 7 The horizontal axis of rep...
no. 2 approach
[0157] Next, refer to Figure 9 to Figure 11 The processing of the control unit 51 in the second embodiment will be described in detail.
[0158] In the second embodiment, the timing at which the striking structure 60 applies the striking force FD to the testing machine body 2 is after the high-speed tensile testing machine 1 performs the tensile test. That is, the determination unit 513 determines the timing at which the striking structure 60 applies the striking force FD to the testing machine body 2 as the timing after the high-speed tensile testing machine 1 executes the tensile test.
[0159] The process of determining the timing of the impact force FD given to the testing machine body 2 by the determination unit 513 is at the start Figure 10 The processing of step S101 of the shown flowchart is executed before the point in time.
[0160] Figure 9 It is a time chart showing an example of processing of the control unit 51 in the second embodiment.
[0161] Figure 9...