Heating round pipe assembly with built-in threaded flow guide water channel and preparation process of heating round pipe assembly
A technology of heating pipes and water pipes, applied in water heaters, fluid heaters, and the shape of heating elements, etc., can solve problems such as failure to meet user requirements, poor user experience, and aging of sealing rings, and achieve rapid, continuous and stable heating , Ingenious design, fast thermal response effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0045] A heating round pipe assembly with a built-in threaded diversion channel, such as Figure 1-Figure 8 As shown, it includes a diversion water pipe 1, a heating pipe 2, a first end cover 3 and a second end cover 4, and a spiral diversion water channel 101 is provided on the outer wall of the diversion water channel 101, and the two sets of heating pipes Set on the outer periphery of the diversion water pipe 1, the heating pipe 2 is provided with a thick film heating element 5, and the two ends of the diversion water pipe 1 are respectively provided with a water inlet 102 and a water outlet 103, and the water inlet 102 Both the water outlet 103 and the water outlet 103 are T-shaped, the water inlet 102 and the water outlet 103 are both connected to the diversion channel 101, and the first end cover 3 and the second end cover 4 are respectively located at the The water inlet 102 and the water outlet 103, the first end cover 3 and the second end cover 4 are closely connected...
no. 2 example
[0054] Such as Figure 9 As shown, the difference between this example and the first example lies in: the inside of the guide water pipe 1 is solid in the heat-generating round pipe assembly with a built-in thread diversion channel described in this example. Specifically, the use of a solid material makes the diversion water pipe 1 more stable.
[0055] A preparation process for a heating round pipe assembly with a built-in threaded diversion channel, comprising the following steps:
[0056] S1: Prepare the diversion water pipe 1, the first end cap 3, the second end cap 4 and the pipe body of the heating pipe 2, and process the water inlet pipe on the first end cap 3 and the second end cap 4 by turning and milling process 301 and outlet pipe 401;
[0057] Both ends of the diversion water pipe 1 are respectively provided with a water inlet 102 and a water outlet 103, and both the water inlet 102 and the water outlet 103 are T-shaped;
[0058] Specifically, the diversion wate...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Height | aaaaa | aaaaa |
| Melting point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 