Bim-based engineering construction information management method and device
A technology of information management and engineering information, applied in the directions of office automation, data processing application, electrical digital data processing, etc., can solve the problems of intelligence and low management efficiency of engineering construction information management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] S13, according to the contract word set, perform a search operation in one or more groups of the engineering contract specifications,
[0078] Utilize the word segmenter and perform a split operation on the normative text of the engineering contract according to the maximum word segmentation granularity,
[0081] It should be explained that the word segmenter can adopt jieba word segmentation, NLTK word segmentation and the like.
[0083] Sort each contract word in the contract word set according to the order of word frequency value from high to low.
[0084] The contract words of the contract word set are sequentially executed in one or more groups of the engineering contract specifications and regulations.
[0085] It should be understood that a fuzzy search refers to allowing certain differences in information to be searched and searched, such as contract terms
[0092] It should be explained that the sensitive information of the construction project signing contract incl...
Embodiment 2
[0128] As shown in FIG. 4, it is the function of the BIM-based engineering construction information management device provided by an embodiment of the present invention
[0129] The BIM-based engineering construction information management device 100 of the present invention can be installed in an electronic device. according to
[0134] The compliance process generation module 105 is used to sequentially input each of the engineering process sheets to the engineering construction
[0135] In detail, each of the BIM-based engineering construction information management device 100 described in the embodiment of the present invention
Embodiment 3
[0137] As shown in FIG. 5, it is a method for realizing a BIM-based engineering construction informatization management method provided by an embodiment of the present invention.
[0138] The electronic device 1 may include a processor 10, a memory 11 and a bus, and may also include storage in the storage
[0139] Wherein, the memory 11 includes at least one type of readable storage medium, and the readable storage medium includes
[0140] The processor 10 may, in some embodiments, consist of an integrated circuit, such as an integrated circuit of a single package
[0141] The bus may be a peripheral component interconnect standard (peripheral component interconnect, abbreviated as
[0144] Further, the electronic device 1 may also include a network interface, optionally, the network interface may include
[0145] Optionally, the electronic device 1 may also include a user interface, and the user interface may be a display (Display), an input
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


