Mounting method for middle support of liquid cargo pump tubular column
An intermediate support and installation method technology, which is applied to ships and other directions, can solve the problems of installing total stations, difficult operation, and difficulty in ensuring the installation accuracy of intermediate supports, and achieve the effects of reducing workload, shortening the installation period, and facilitating operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The following in conjunction with the accompanying drawings and specific embodiments, further elaboration of the present invention, it should be understood that these embodiments are used only to illustrate the present invention and not to limit the scope of the present invention, after reading the present invention, those skilled in the art of the various equivalent forms of modification of the present invention are within the scope of the appended claims of the present application.
[0023] as Figure 1-3 As shown, a liquid cargo pump pipe string intermediate support installation method, including the following steps,
[0024] S1: In the ship platform stage, according to the design requirements, mark the liquid cargo pump pipe string 1 in the center of the suction well 2 and mark it;
[0025] S2: Place the total station in a suitable position at the bottom of the cargo hold;
[0026] S3: Using the total station to absorb the center of the well as the reference point, in th...