Uplink transmission method and device
A transmission method and time-domain position technology, applied in the field of communication, can solve problems such as UCI cannot be transmitted normally, and achieve the effect of avoiding blocking and ensuring transmission performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0280] Embodiment 1: Assuming that the terminal is configured with a CG PUSCH transmission on a carrier, and the physical layer priority corresponding to this CG PUSCH is high priority, assuming that the terminal receives a PDCCH carrying an uplink scheduling grant (UL grant), Scheduling to transmit a dynamic grant (Dynamic Grant, DG) PUSCH on this carrier, and the time domain resource of this DG PUSCH overlaps with the time domain resource of CG PUSCH, and the physical layer priority corresponding to this DG PUSCH is low priority;
[0281] Terminal side:
[0282] Determine whether the end time of the PDCCH scheduling the DG PUSCH is not later than T2 before the start time of the CG PUSCH CG time, where T2 CG is a time determined according to the transmission parameters of CG PUSCH;
[0283] Judging whether the start time of the DG PUSCH is not earlier than the start time of the CG PUSCH;
[0284] When both of the above two judgments are yes, it is considered that the time ...
Embodiment 2
[0295] Embodiment 2: Based on the above embodiment 1, it is assumed that there is also a PUCCH with a high priority corresponding to the physical layer overlapping with CGPUSCH, and according to the multiplexing transmission rule when PUCCH and PUSCH with the same priority overlap, the DLgrant corresponding to PUCCH and PUCCH and PUCCH The channel with the earliest starting point between CG PUSCHs satisfies the time interval not less than T2mux, and the PDSCH scheduled by DLgrant (that is, the PDSCH corresponding to the PDSCH that transmits HARQ-ACK on PUCCH) and the channel with the earliest starting point between PUCCH and CG PUSCH The time interval between them is not less than T1mux, where T1mux determines the processing time according to the relevant configuration and parameters of PDSCH, DL grant and PUCCH, and is used to simulate the preparation time for UCI transmission. T2mux is based on CGPUSCH, PUCCH, UL grant, DL The relevant configuration and parameters of the gran...
Embodiment 3
[0306] Embodiment 3: Assume that the terminal schedules a DG PUSCH1 transmission on carrier 1 through the PDCCH carrying UL grant, and schedules a DG PUSCH2 transmission on carrier 2 through the PDCCH carrying UL grant, and both PUSCH1 and PUSCH2 are connected to a carrier HARQ- The PUCCHs of the ACK overlap, and the physical layer priorities of the two DG PUSCHs and PUCCHs are the same, and both DG PUSCHs are configured to enable UL skipping, that is, if there is no data transmission, the MAC may not generate PDUs for the DGPUSCH;
[0307] Terminal side:
[0308] Determine whether the scheduling of the two DG PUSCH and PUCCH satisfies T1mux and T2mux, that is, the interval between the DL grant and UL grant and the channel starting point of the earliest channel among the overlapping PUSCH1, PUSCH2 and PUCCH is not less than T2mux, and the interval between the PDSCH and the overlapping PUSCH1 , the interval between the channel starting point of the earliest channel in PUSCH2 an...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


