Partitioned early-dismantling construction method for inner support of deep foundation pit
A construction method and technology of deep foundation pits, which are applied in infrastructure engineering, excavation, construction, etc., can solve the problems of long construction period and achieve the effects of shortening construction period, improving construction efficiency, and quickly dismantling supports
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain related inventions, rather than to limit the invention. It should also be noted that, for ease of description, only parts related to the invention are shown in the drawings.
[0022] It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and embodiments.
[0023] refer to Figure 1 to Figure 5 As shown, the present invention provides a construction method for early demolition of internal support partitions of deep foundation pits, comprising the following steps:
[0024] a. After the internal support 3 is constructed in the support structure 1 of t...