PE pipeline connecting equipment for water conservancy project
A technology for connecting equipment and water conservancy projects. It is applied in the direction of mechanical equipment, applications, tubular objects, etc. It can solve the problems of unable to meet the connection requirements of PE pipes and the inability to use heat-connecting equipment, so as to facilitate heat-connecting work and increase buffer safety protection measures. , Improve the effect of heat transfer efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] A kind of PE pipeline connection equipment for water conservancy projects, such as Figure 1-Figure 3 As shown, it includes a base 1, a heater 2, a clamping mechanism 3 and a thermal bonding mechanism 4. The clamping mechanism 3 is provided on the right side of the top of the base 1, and the thermal bonding mechanism 4 is provided on the left side of the top of the base 1. The thermal bonding mechanism 4 A heater 2 is arranged on the forward and backward symmetrical rotation type.
[0027] First of all, people install the three PE pipes that need to be thermally connected on the clamping mechanism 3, and move and adjust the position of the clamping mechanism 3 to cooperate with the thermal bonding mechanism 4, so that the heater 2 is connected to the interface between the three PE pipes, and it is carried out. Heat connection, to achieve the effect of improving the efficiency of heat connection.
[0028] The clamping mechanism 3 includes a first slide rail 31, a first ...
Embodiment 2
[0032] On the basis of Example 1, such as Figure 4-Figure 7 As shown, a positioning mechanism 5 is also included. The positioning mechanism 5 includes a first guide rail 51, a rotating shaft 52, a first gear 53, a first rack 54, a first push rod 55 and a second push rod 56. The top of the base 1 is spaced Four first guide rails 51 are evenly arranged, and the top of the base 1 is provided with a rotating shaft 52 symmetrically rotating back and forth. A rack 54 meshes with the first gear 53, the first rack 54 on the front and rear sides is connected with the first push rod 55, the first push rod 55 cooperates with the connecting plate 44, and the right side of the first rack 54 in the middle is provided with The second push rod 56.
[0033]Also include forward pushing mechanism 6, forward pushing mechanism 6 includes first guide bar 61, the 3rd slide frame 62, handle 63, second push rod 64 and first spring 65, the second installation frame 35 right sides are provided with T...