Tower crane balancing weight locking device and locking method thereof
A technology of locking devices and counterweights, which is applied in cranes and other directions, can solve the problems of easy collision of counterweights, potential safety hazards, falling off, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] A tower crane counterweight locking device, comprising a balance arm 1, a penetrating slot 3 for placing a counterweight 2 is opened inside the balance arm 1, a fixed rod 4 that extends out movablely is arranged inside the counterweight 2, the fixed rod 4 and the balance The weight 2 is poured and fixed, and the two ends of the fixed rod 4 protrude out of the balance weight 2 respectively. After the fixed rod 4 is completely fixed, the balance weight 2 can be completely fixed. The fixed rod 4 can be set as a cylinder or can be set The rectangular shape needs to be determined according to the actual use situation. The balance arm 1 is located on both sides of the through groove 3 and is fixed with a number of guide rails 5. The inside of the guide rail 5 is equipped with a locking block 6 for fixing the fixed rod 4. The locking block 6 is movable. Set inside the guide rail 5;
[0045] The inside of the locking block 6 is provided with an interconnected baffle groove 7 an...
Embodiment 2
[0049] On the basis of Embodiment 1, considering that cement can solidify faster in a higher temperature environment, this embodiment generates high-temperature gas through the reaction of zinc rod 25 and hydrochloric acid to increase the temperature inside the fixing tank 8, and the bearing block 12 An installation groove 21 and a reaction chamber 22 for storing hydrochloric acid are provided inside, and a bearing plate 23 is movable inside the installation groove 21, and part of the cement and water falling into the fixed groove 8 will fall on the bearing plate 23, and the bearing plate 23 and The inner wall of the installation groove 21 is fixedly connected with a first elastic block 24, and the bearing plate 23 is fixedly connected with a zinc rod 25 that movably extends into the inside of the reaction chamber 22 and is in active contact with the hydrochloric acid. By controlling the surface area of the zinc rod 25 and the concentration of the hydrochloric acid, it can be ...
Embodiment 3
[0051] On the basis of Embodiment 2, considering that if the mixture of cement and water is not stirred, the cement and water cannot be fully fused, the inside of the bearing block 12 is provided with a stirring chamber 26 communicated with the reaction chamber 22, and the inside of the stirring chamber 26 A piston disc 27 is movable, and an elastic rod 2701 is fixedly connected to the inner wall of the piston disc 27 and the stirring chamber 26. The piston disc 27 and the inner wall of the stirring chamber 26 form a closed space, and the gas generated inside the reaction chamber 22 enters the inside of the stirring chamber 26 to drive The piston disc 27 rises, and the piston disc 27 is fixedly connected with a threaded screw mandrel 28 that movably extends into the inside of the fixed groove 8. The threaded screw mandrel 28 passes through the threaded hole 29 and stretches into the inside of the fixed groove 8. The threaded screw mandrel 28 is inside the threaded hole 29. Rota...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


