Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Subway temporary ventilation pavilion and cooling tower pipeline part relocation and transformation construction method

A construction method and cooling tower technology are applied in the construction field of the temporary relocation of subway air pavilions and cooling tower pipelines, which can solve the problems of tight construction period and long construction period of cooling tower pipelines, shorten the construction period and improve the construction period. The effect of pressing and reducing the amount of construction

Active Publication Date: 2022-06-28
广州珠江建设发展有限公司
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the above-mentioned related technologies, the inventor believes that when the air duct and the cooling tower pipeline are partly within the scope of the new project, the construction period of the temporary wind pavilion and the relocation of the cooling tower pipeline is long and the construction period is urgent.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Subway temporary ventilation pavilion and cooling tower pipeline part relocation and transformation construction method
  • Subway temporary ventilation pavilion and cooling tower pipeline part relocation and transformation construction method
  • Subway temporary ventilation pavilion and cooling tower pipeline part relocation and transformation construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0049] The following is attached Figure 1-8 The application is described in further detail.

[0050] The embodiment of the present application discloses a construction method for partial relocation of a temporary subway wind pavilion and a cooling tower pipeline. refer to figure 1 , figure 2 and image 3 , a construction method for partial relocation of subway temporary wind pavilions and cooling tower pipelines, comprising the following steps:

[0051] Determine the scope of relocation: According to the planning of the new project, determine the wind pavilion and cooling tower pipeline 5 within the scope of the new project, and draw a line mark, excavate the foundation pit to the roof of the old air duct 3 within the scope of the new project;

[0052] Relocation of cooling tower pipeline 5: relocate the cooling tower pipeline 5 within the scope of the new project to the old air duct 3 outside the scope of the new project, extend to the ground along the old air duct 3 ou...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a subway temporary ventilation pavilion and cooling tower pipeline part relocation and relocation construction method which comprises the steps of relocation and relocation range determination, cooling tower pipeline relocation and relocation, new temporary pipe gallery construction, new temporary ventilation pavilion construction, old air duct and old ventilation pavilion dismantling and backfilling. A cooling tower pipeline in a newly-built project range in the old air duct is changed into an old air duct outside the newly-built project range; afterwards, a supporting wall is built in the old air duct outside the newly-built project, the supporting wall and the old air duct outside the range of the newly-built project jointly form a temporary pipe gallery in the project construction period, meanwhile, a temporary ventilation pavilion is built above the old air duct outside the newly-built project, and a ventilation system of the subway conducts air outlet and ventilation from the temporary ventilation pavilion; and finally, the old ventilation pavilion and the old air duct in the newly-built project range are dismantled, the strength of all stress nodes of the supporting wall is measured, and after the design strength requirement is met, backfilling is conducted on the open cut foundation pit. The method has the effect of shortening the temporary ventilation pavilion and cooling tower pipeline part relocation construction period.

Description

technical field [0001] This application relates to the field of subway wind pavilions and cooling towers, and in particular to a construction method for partial relocation of subway temporary wind pavilions and cooling tower pipelines. Background technique [0002] At present, with the development of underground rail transit, there are more and more new commercial complex projects next to the subway station. However, due to the incomplete urban planning in the early stage, such newly-built commercial projects next to existing subway stations often overlap in space with the above-ground wind pavilions, cooling towers and cooling tower pipelines of the subway station, so it is necessary to In front of the commercial complex of the subway, complete the relocation of the wind pavilion, cooling tower and cooling tower pipeline of the subway where the space overlaps. Due to the subtropical geographical environment of most developed cities in southeast my country, the window perio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/045E04G23/02
CPCE02D29/045E02D29/10E02D29/04E04G23/02Y02B30/70
Inventor 温喜廉叶家成黄林刘三玲胡敬杰曾梓杰岑积强盛思安
Owner 广州珠江建设发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products