Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

30results about How to "Small amount of construction work" patented technology

Industrial pilot test performance testing device and industrial pilot test performance testing method for SCR (selective catalytic reduction) denitration catalyst

PendingCN105628857AVerify activityVerification selectivityChemical analysis using catalysisAir preheaterFlue gas
The invention relates to an industrial pilot test performance testing device and an industrial pilot test performance testing method for an SCR (selective catalytic reduction) denitration catalyst, aiming to solve the problem that an existing denitration catalyst testing device is incapable of simulating influences of load change on a catalyst during actual running. The industrial pilot test performance testing device comprises a testing device body comprising a gas distribution portion, a reaction portion and a measurement portion, wherein the gas distribution portion is communicated with a gas outlet of a coal economizer, and the reaction portion is communicated with a gas outlet of an air preheater. The testing device body achieves gas distribution and reaction of boiler tail gas through the gas distribution portion and the reaction portion, and the measurement portion is used for collecting and analyzing sample gas. The testing device body is arranged in a boiler tail gas system during actual industrial production, and the boiler tail gas serving as test gas of the testing device body enables flue gas for testing to have physicochemical and process properties of actual flue gas to produce influencing substances, so that reaction between the catalyst in the reaction portion with the flue gas for testing is guaranteed, and accurate and reliable test data are provided for research on running of the existing catalyst under the conditions of different temperatures and flue gas components.
Owner:ZHEJIANG ZHENENG TECHN RES INST

Electrical equipment detection line and detection method based on automatic guidance carrier vehicle

The invention discloses an electrical equipment detection line and detection method based on an automatic guidance carrier vehicle. The electrical equipment detection line comprises a testing site and at least one automatic guidance carrier vehicle. A plurality of testing stations and a central control room are arranged inside the testing site. Different testing instruments are arranged at the testing stations. A center control computer is arranged inside the central control room. The testing instruments at the testing stations are connected with the center control computer in a communication mode. The automatic guidance carrier vehicle carries an electrical equipment sample used for tests and runs among the testing stations according to a certain test procedure under the control of the center control computer inside the central control room, all tests are conducted on the electrical equipment sample carried by the automatic guidance carrier vehicle, and test data obtained by the testing instruments at the testing stations are transmitted back to the center control computer inside the central control room in a communication mode to be collected. Compared with a traditional electrical equipment testing method, the electrical equipment detection line and detection method have the advantages that detection efficiency is higher, and labor intensity of test personnel is lower.
Owner:上海思创电器设备有限公司 +1

Integrated device for deodorization and sewage treatment in municipal sewage plant and technology thereof

InactiveCN103041696ASolve the problem of deodorization upgrading and transformationSimple processTreatment using aerobic processesDispersed particle separationOdor sourceMunicipal sewage
The invention discloses an integrated device for deodorization and sewage treatment in a municipal sewage plant. The integrated device comprises a semi-hermetic gas collection building mounted on an odor source, an air blower and an aeration tank, wherein malodorous gas is collected in the semi-hermetic gas collection building; a ventilation opening and a gas pipeline are arranged above the semi-hermetic gas collection building; the gas pipeline conveys the malodorous gas to an aeration pipeline through the air blower; and the aeration pipeline conveys the malodorous gas to the aeration tank. According to the invention, through the method, the design, operation and management of a deodorization facility can be simplified, the investment and operation cost is reduced, the various malodorous substances can be effectively processed, and the processing effect is good. An odor collection pipeline can be connected with the original blast aeration equipment, so that the amount of construction engineering is reduced, and the integrated device and the technology are very suitable for upgrading and reconstruction of deodorization of the built sewage treatment plant and the construction of the integrated deodorization facility of the newly-built sewage treatment plant.
Owner:SUZHOU RES INST OF TONGJI UNIV

Downward layering horizontal drift high-sublevel filling mining method

The invention discloses a downward layering horizontal drift high-sublevel filling mining method. The downward layering horizontal drift high-sublevel filling mining method particularly comprises thesteps of division of ore blocks, stope preparation cutting, stoping, stope ventilation and stope filling and so on, and a whole sublevel mine can be mined. The sublevel height is increased, the stoping layer number is increased, the sublevel stoping mine amount is increased, the panel service life can be prolonged, panel mining disorder can be solved, after middle level stope preparation engineering arranging optimization, six sublevels are arranged in the 150 m middle level, the sublevel construction is reduced, the middle level stope preparation engineering amount is reduced by about 3500m / 72000m<3>, the mine engineering construction investment is greatly saved, after the sublevel height is increased, the sublevel service life is prolonged, the sublevel digging disorder contradiction isrelieved, and the sublevel engineering construction pressure is reduced.
Owner:JINCHUAN GROUP LIMITED

Method and device for integral deodorization and sewage treatment of municipal sewage plants

The invention discloses a method for integral deodorization and sewage treatment of municipal sewage plants. The method comprises the following steps of: erecting a half-sealed gas collection area around or above an odor source, or using a former half-sealed building, and collecting generated odor; and conveying the odor into a submersible jet type aerator through a conveying pipeline, uniformly enabling the mixed odor and sewage to enter an aeration basin through the submersible jet type aerator, and removing fusty matters through adsorption, dissolving and biological degradation. With the adoption of the manner, the method for the integral deodorization and sewage treatment of the municipal sewage plants can be used for simplifying the design, the operation and the management of a deodorization facility, reducing the investment cost and the operation cost, and effectively treating various fusty matters. Furthermore, the method for the integral deodorization and sewage treatment of the municipal sewage plants has a good treatment effect and is very applicable to deodorization updating improvement of the built sewage plants and construction of an integrated deodorization facility of newly built sewage plants.
Owner:SUZHOU TONGDE ENVIRONMENTAL PROTECTION TECHCO

Building type heat exchanger unit based on energy consumption analysis

The invention relates to a building type heat exchanger unit based on energy consumption analysis. The building type heat exchanger unit based on energy consumption analysis comprises a process module, a control module, a data storage module and an energy consumption analysis module. The control module is connected with the process module and the data storage module, and the energy consumption analysis module is connected with the data storage module. The process module is used for executing a heat supply process flow; the control module is used for performing comparison operation on the system operation condition data and a target value to obtain a control instruction to control the heat supply process flow until the target value is reached; the data storage module is used for storing theprocess physical quantities and control instruction data; and the energy consumption analysis module is used for performing energy consumption analysis according to the energy consumption data in theprocess physical quantities to obtain the energy consumption monitoring data for providing support for the control and measurement of energy application quantities. The building type heat exchanger unit based on energy consumption analysis has the advantages of being small in occupied area, flexible in arrangement, flexible in heat supply adjustment, high in sensitivity and quick in response, operation parameters can be adjusted in time according to the heat supply demand of heat consumers, the hydraulic imbalance degree is reduced, and demand-based heat supply is achieved.
Owner:DATANG DONGBEI ELECTRIC POWER TESTING & RES INST +1

Process and device for lime calcining by cement kiln tail

The invention provides a process and device for lime calcining by cement kiln tail. The device comprises a cement kiln tail preheating unit, a decomposition furnace, a cyclone separator and a coolingunit. The preheating unit is formed by connection of multistage preheating cyclones, the last-stage cyclone of the preheating unit is replaced by the cyclone separator, and a discharging port of the penultimate-stage cyclone of the preheating unit is connected with a feeding port of the decomposition furnace. An air inlet of the cyclone separator is connected with a strip airflow outlet of the decomposition furnace, a bottom discharging port of the cyclone separator is connected with a feeding port of the cooling unit, and an air outlet of the cooling unit is connected with a conical air inletof the decomposition furnace. The process and the device have advantages of low cement kiln transformation, small floor space, high raw material and fuel adaptability, stability in operation and highproduct quality.
Owner:NANJING KISEN INT ENG

Curing and dry heaping method for fine grained tailings

The invention discloses a curing and dry heaping method for fine grained tailings. A tailing dry heaping field is divided into 4-10 layers of spatial areas according to the occupied area of the tailing dry heaping field and the tailing discharge flow. The length of each layer of spatial area is 80-200 m, and the width L is equal to 40-60 m; and an outer foundation blocking dam (1) and an inner blocking dam (4) are heaped up on the two sides of the first layer of spatial area correspondingly, an outer tailing blocking dam (2) and an inner blocking dam (4) are heaped up on the two sides of each of the other spatial areas correspondingly, water-permeable geotextile materials (5) are laid in each layer of spatial area, and tailing slurry containing tailing curing agents are discharged into the spatial areas where the water-permeable geotextile materials (5) are laid, wherein the tailing slurry is concentrated till the weight concentration reaches 60+ / -2%. By the adoption of the layered and partitioned heaping mode, the nearest site of the dry heaping field can be selected according to an ore treatment plant, the distance between the heaping field and the ore treatment plant is decreased, the transportation cost of tailings is reduced, the construction project amount of tailing dams is small, the construction investment of the tailing dams is reduced, the construction time of the tailing dams is shortened, the adaptability is high, and the tailing dry heaping problem in pluvial regions of southern China is solved.
Owner:SINOSTEEL MAANSHAN INST OF MINING RES

Method for cultivating and grafting tree-formed roses and Chinese roses in out-door non-greenhouse environment

The invention discloses a method for cultivating grafted tree-shaped roses and Chinese roses in outdoor non-greenhouses. 1), selection of grafting time; 2), outdoor grafting; When the wound of the graft and the rootstock is gradually healed, and when the graft starts to grow and the temperature gradually rises, the breathing hole on the bag is slowly expanded according to the growth of the new bud, so that the new bud of the branch is slowly exposed to adapt to the environment outside the bag; 4) Follow-up topping, tiller removal, and water and fertilizer management; through the above outdoor grafting work, the construction cost of the greenhouse can be saved. Through my practice in the past three or four years, it can be cultivated successfully without the use of greenhouse grafting outdoors and the cost is low. more than one-third of the shed.
Owner:安康市汉阴县祥瑞农林开发有限责任公司

Plant for using converter produced vapor in vacuum refining furnace

The plant for using converter produced vapor in vacuum refining furnace pump includes three parts of a converter flue vaporizing and cooling system, a vacuum pump vapor pipeline and outward vapor feeding pipeline for the vaporizing and cooling system. The present invention features the new technological process of providing vapor to vacuum pump, and the technology has wide converage area and is especially suitable for adopting vacuum refining technology in converter steelworks.
Owner:SHOUGANG CORPORATION

Low-power-consumption, simple and universal type cable well lid monitoring device

The invention discloses a low-power-consumption, simple and universal type cable well lid monitoring device which comprises a stroke switch. The stroke switch is arranged on the well wall of the innerlower edge of a to-be-monitored well lid. A well lid state monitoring unit is arranged on the stroke switch. The well lid state monitoring unit is connected with an MCU control unit. The MCU controlunit is connected with a wireless communication unit, a clock unit, a data storage unit, a battery and voltage conversion unit, a power control unit and a debugging serial port. The MCU control unit monitors the opening and closing states of the well lid in real time through a well lid state monitoring unit circuit. The clock unit starts the MCU control unit in a timing manner according to a preset time interval so as to provide power for the wireless communication unit module and the data storage unit, the current well lid state is reported in time through the wireless communication unit, andthe wireless communication unit is connected with a background monitoring center. By means of the low-power-consumption, simple and universal type cable well lid monitoring device, real-time monitoring and timely alarming functions on the cable well lid state are achieved, and the safety protective property on the cable well lid is improved.
Owner:郑州祥和集团有限公司 +2

Goaf circulating grouting and filling system for treating solid waste

The invention discloses a goaf circulating grouting and filling system for treating solid waste. The goaf circulating grouting and filling system comprises a slurrying system, a grouting and filling system and a water resource recovery system, wherein the slurrying system is used for grinding solid waste to be treated into micro-particles with set particle sizes, and mixing the micro-particles with water to prepare slurry with specific concentration; the grouting and filling system is used for injecting the slurry prepared by the slurrying system into a goaf from a high position, the slurry undergoes solid-liquid separation in the process of flowing from the high position to a low position in the goaf by utilizing the filtering characteristic of the goaf and the precipitation characteristic of the slurry, and solid particles precipitate in the goaf, so that the purpose of treating solid wastes is achieved; and the water resource recovery system is used for recovering purified water flowing to the low position in the goaf and conveying the purified water to the slurrying system for slurrying of the solid waste, so that cyclic utilization of water resources is achieved. Compared witha traditional solid waste filling method, the goaf circulating grouting and filling system has the advantages of being small in construction work amount, small in investment, low in cost, small in influence on a mine production system and the like.
Owner:中煤能源研究院有限责任公司

Method for treating nitrobenzene and phenylamine waste water by using plant system

The invention relates to a method for treating nitrobenzene and phenylamine waste water by using a plant system. The method is characterized in that plants are planted on dry land, low-lying land, wet land, intertidal zone and marsh land. The waste water is introduced through a pipeline, and in addition, the nitrobenzene and phenylamine contaminants are absorbed and enriched under the effect of plants. Through the tests, poplars, willows, locust trees, wheatgrass and reed have high enriching coefficients on nitrobenzene and phenylamine and can be used for efficiently removing contaminant substances, and the problem of nitrobenzene and phenylamine waste water pollution is solved. The method has the advantages that the investment and operation cost is low, the maintenance is simple, the engineering quantity is small, and good effects of preserving soil and water, conserving soil and beautifying the landscape environment are realized.
Owner:LANZHOU UNIVERSITY

Application of an automatic guided transport vehicle in the inspection line of electric equipment

The invention discloses an application of automatic guide transporter in a production line for detecting power equipment. According to the application, for an existing automatic guide transporter used for the production line is applied to an electrical equipment test, in comparison with traditional electrical equipment, the testing efficiency is higher in detection efficiency and smaller in labor intensity of a tester. In comparison with a production line of a rail type electrical equipment test, the application has the advantages of less construction work amount of testing field and short construction period; when the automatic guide transporter is in fault, other automatic guide transports can continuously work and do not affect the operation of a test center. Aiming at a new testing project, the application provided by the invention has the advantages of fast upgrading and low cost.
Owner:上海思创电器设备有限公司 +1

Three gorge reservoir region slope cropland bank building method and slope cropland bank

The invention discloses a three gorge reservoir region slope cropland bank building method and a slope cropland bank. The slop cropland bank is formed by an upper layer and a lower layer. The lower layer is a hard material layer and the upper layer is a soil layer. The hard material layer is formed by piling up strip rock (or rock blocks and hollow bricks) and natural seams are formed; and short shrub and herbaceous economic plants are planted at two sides of the top of the soil layer and the middle portion is used as a walking path. Rough treatment is conducted on an upper surface of the hard material layer in touch with the soil layer, a plurality of grooves are formed at intervals in the upper surface and the soil layer is embedded in the grooves partly. A plurality of water drainage holes are formed in a wall face of the hard material layer along different height. According to the three gorge reservoir region slope cropland bank building method and the slope cropland bank, investment is small, construction is simple, repair is easy and the conditions that a single soil bank is unstable, a single rock bank is high in cost and the like can be obviously improved. The plants planted on the soil layer is beneficial for fixing soil and improving fertility, the plants are combined with the bank so that double adjusting functions are achieved, water and soil loss control effect is notable and meanwhile economic benefit is generated.
Owner:CHONGQING NORMAL UNIVERSITY

Ground-proximity wind power generation device

The invention provides a ground-proximity wind power generation device. Wind in each direction is collected through wind collecting ports of curved reducing pipes at four sides of a wind collecting box, and the wind speed is improved greatly so that a wind turbine is driven to rotate, and low-speed wind energy can be effectively utilized for power generation. The device can meet the requirement for power generation using ground-proximity low-speed wind energy in vast urban areas, and the power supply shortage in central areas with low wind speed load is solved effectively. In addition, the ground-proximity wind power generation device has the advantages of small work amount of construction, and easy construction, and is also applied and popularized in remote areas as a distributed power generation device.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

A detection line and detection method for power equipment based on automatic guided transport vehicles

The invention discloses an electrical equipment detection line and detection method based on an automatic guidance carrier vehicle. The electrical equipment detection line comprises a testing site and at least one automatic guidance carrier vehicle. A plurality of testing stations and a central control room are arranged inside the testing site. Different testing instruments are arranged at the testing stations. A center control computer is arranged inside the central control room. The testing instruments at the testing stations are connected with the center control computer in a communication mode. The automatic guidance carrier vehicle carries an electrical equipment sample used for tests and runs among the testing stations according to a certain test procedure under the control of the center control computer inside the central control room, all tests are conducted on the electrical equipment sample carried by the automatic guidance carrier vehicle, and test data obtained by the testing instruments at the testing stations are transmitted back to the center control computer inside the central control room in a communication mode to be collected. Compared with a traditional electrical equipment testing method, the electrical equipment detection line and detection method have the advantages that detection efficiency is higher, and labor intensity of test personnel is lower.
Owner:上海思创电器设备有限公司 +1

A device for integrated deodorization and sewage treatment in municipal sewage plants

The invention discloses a device for integrated deodorization and sewage treatment in a municipal sewage plant. The device comprises a semi-closed gas-collecting building arranged on an odor source, a submersible jet type aeration machine and an aeration tank, wherein a ventilation opening and a gas pipeline are arranged above the semi-closed gas-collecting building; the gas pipeline is communicated with the submersible jet type aeration machine; the malodorous gas of the odor source enters the submersible jet type aeration machine through the gas pipeline; the submersible jet type aeration machine is arranged below sewage in the aeration tank; the malodorous gas of the odor source and the sewage are mixed and are pumped into the aeration tank through the submersible jet type aeration machine; and the malodorous gas is removed through biochemical action in the aeration tank. Due to the mode, the design, operation and management of the deodorization facility can be simplified, and the investment and operating cost is reduced. Various malodorous substances are effectively treated by utilizing the biodegradation function of the aeration tank, and the treatment effect is good; and meanwhile, the odor treatment capacity can be adjusted according to the seasonal variation, and the device is easy and convenient to operate and high in adaptability.
Owner:SUZHOU TONGDE ENVIRONMENTAL PROTECTION TECHCO

Green belt drainage channel artificial wetland device for treating rainfall runoff pollution of road

The invention discloses a green belt drainage channel artificial wetland device for treating rainfall runoff pollution of a road. The device comprises a tank body, a packing layer and a wetland plant which is planted on the surface layer of the packing layer, wherein a water collection tank is formed at the bottom of the tank body; the packing layer is arranged on the upper part of the water collection tank in the tank body; the water collection tank and the packing layer are partitioned from each other through a perforated filter board; a gravel layer, a sandy soil layer, a blast furnace slag and lime stone mixing layer, a fine stone layer and a rubble layer are arranged on the packing layer sequentially from top to bottom; a perforated water distribution pipe is arranged on the surface layer of the packing layer; and a filter screen is arranged at a water inlet of the perforated water distribution pipe. The wetland device has multiple functions such as a screen belt landscape function, a grass planting drainage channel drainage and decontamination function, a vertical downstream wetland treating function, a stored water and rain water recycling function and the like; and a wetland tank body is used as a green belt tank body and a drainage channel tank body simultaneously, so that the device saves the floor area of an individual building, reduces construction working amount and has lower economic input.
Owner:SOUTH CHINA UNIV OF TECH

A method suitable for dry-stacking fine-grained tailings on flat land or beside mountains

The invention discloses a method suitable for conducting dry heaping on fine grained tailings on a flat ground or beside a mountain. The mode that dry heaping damming is conducted on the four sides of the flat ground and the tailings are discharged in the middle is adopted, or the mode that dry heaping damming is conducted on three sides beside the mountain and the tailings are discharged in the middle is selected, each side of a tailing dry heaping field is divided into 4-10 layers of space areas, and each layer of space area is 80-200 m in length and 40-60 m in width L. An outside foundation blocking dam (1) and an inside blocking dam (4) are built in a heaping mode on the two sides of the first layer of space area correspondingly. Outside tailing blocking dams (2) and inside blocking dams (4) are built in a heaping mode on the two sides of the other layers of space areas correspondingly. Water-permeability earthwork materials (5) are paved on each layer of space area. In addition, tailing slurry is concentrated to be 60+ / -2% in weight concentration, a tailing curing agent is added to the tailing slurry, the obtained tailing slurry is discharged into the space areas paved with the water-permeability earthwork materials (5), and heaping is conducted by layer and area. Through the method, the distance between the heaping field and a dressing plant is shortened, the tailing conveying cost is reduced, tailing dam building investment and time are reduced, and the adaptability is high.
Owner:SINOSTEEL MAANSHAN INST OF MINING RES CO LTD +1

Subway temporary ventilation pavilion and cooling tower pipeline part relocation and transformation construction method

ActiveCN114673193AImprove the shortcoming of the urgent construction periodReduce the amount of changeArtificial islandsBuilding repairsCooling towerArchitectural engineering
The invention relates to a subway temporary ventilation pavilion and cooling tower pipeline part relocation and relocation construction method which comprises the steps of relocation and relocation range determination, cooling tower pipeline relocation and relocation, new temporary pipe gallery construction, new temporary ventilation pavilion construction, old air duct and old ventilation pavilion dismantling and backfilling. A cooling tower pipeline in a newly-built project range in the old air duct is changed into an old air duct outside the newly-built project range; afterwards, a supporting wall is built in the old air duct outside the newly-built project, the supporting wall and the old air duct outside the range of the newly-built project jointly form a temporary pipe gallery in the project construction period, meanwhile, a temporary ventilation pavilion is built above the old air duct outside the newly-built project, and a ventilation system of the subway conducts air outlet and ventilation from the temporary ventilation pavilion; and finally, the old ventilation pavilion and the old air duct in the newly-built project range are dismantled, the strength of all stress nodes of the supporting wall is measured, and after the design strength requirement is met, backfilling is conducted on the open cut foundation pit. The method has the effect of shortening the temporary ventilation pavilion and cooling tower pipeline part relocation construction period.
Owner:广州珠江建设发展有限公司

A experimental device for researching the scaling effect of a physical model of river water environment

The invention discloses a river water environment physical model scale effect research test device. The device comprises a scaling system, a circulation system and a measurement and control system, wherein the scaling system comprises side walls, a width adjustment gate, a clamping plate frame, a rail, a bidirectional telescopic rod, a dual-slot gear box and the like; the circulation system comprises a water collecting tank, a water return pipeline, a water pump, a water feeding pipe, a water box and a flow stabilization cover; the measurement and control system comprises a triangular water measurement weir, an ADV three-dimensional flow velocity meter, a high-frequency digital camera, a water quality sensor and a data processor. According to the device, the three-dimensional scale of a model is scaled randomly by the fractal and the recombination of the side walls; riverway forms and boundaries are emulated by utilizing side wall bending and riverbed change; the device has an ingenious design and has the advantages of fast transformation, high efficiency, obvious scale mesoscopic effect and the like.
Owner:HOHAI UNIV +1

A method for solidifying and dry-stacking fine-grained tailings

The invention discloses a curing and dry heaping method for fine grained tailings. A tailing dry heaping field is divided into 4-10 layers of spatial areas according to the occupied area of the tailing dry heaping field and the tailing discharge flow. The length of each layer of spatial area is 80-200 m, and the width L is equal to 40-60 m; and an outer foundation blocking dam (1) and an inner blocking dam (4) are heaped up on the two sides of the first layer of spatial area correspondingly, an outer tailing blocking dam (2) and an inner blocking dam (4) are heaped up on the two sides of each of the other spatial areas correspondingly, water-permeable geotextile materials (5) are laid in each layer of spatial area, and tailing slurry containing tailing curing agents are discharged into the spatial areas where the water-permeable geotextile materials (5) are laid, wherein the tailing slurry is concentrated till the weight concentration reaches 60+ / -2%. By the adoption of the layered and partitioned heaping mode, the nearest site of the dry heaping field can be selected according to an ore treatment plant, the distance between the heaping field and the ore treatment plant is decreased, the transportation cost of tailings is reduced, the construction project amount of tailing dams is small, the construction investment of the tailing dams is reduced, the construction time of the tailing dams is shortened, the adaptability is high, and the tailing dry heaping problem in pluvial regions of southern China is solved.
Owner:SINOSTEEL MAANSHAN INST OF MINING RES CO LTD

Urban bus charging station layout planning method and device and readable storage medium

The invention provides an urban bus charging station layout planning method and device and a storage medium, wherein the method comprises the steps: measuring and calculating the positive and negative difference value of supply and demand of each bus charging station according to the charging demand of a bus station and the scale of an existing bus charging station, and determining the supply and demand state of each bus charging station; performing region division on all existing bus charging stations in a to-be-planned range through a Thiessen polygon method; merging the Thiessen polygonal areas of all the bus charging stations, so that all the areas can achieve supply and demand balance; and for the areas in which the supply-demand balance cannot be realized after combination, selecting to reconstruct and expand the existing charging stations or newly built charging stations according to the positive and negative supply-demand difference values. According to the method, regional balance is realized through regional division and merging, and the construction work amount of urban charging facilities can be greatly reduced. Meanwhile, the method has good toughness, and later optimization and adjustment are facilitated. In addition, waste of charging resources can be reduced, and the wasted and idle charging resources are reasonably utilized through regional allocation.
Owner:XIDI (SUZHOU) SURVEY & DESIGN CONSULTING CO LTD

Flood draining and water returning in-common device used for tailing reservoir

The invention discloses a flood draining and water returning in-common device used for a tailing reservoir. The flood draining and water returning in-common device comprises a headframe, a well seat, a flood draining pipe and a water returning pipe. The headframe is composed of vertical columns and ring beams. A plurality of flood draining inlets are defined by the vertical columns and the ring beams. Water returning vertical pipes are arranged in the vertical columns and provided with a plurality of water returning inlets. The well seat serves as a foundation of the headframe. A flood draining channel and a water returning channel which do not communicate with each other are formed in the well seat simultaneously. The flood draining pipe communicates with the flood draining channel arranged on the well seat. The headframe, the flood draining channel and the flood draining pipe constitute a communicating flood draining system. The water returning pipe communicates with the water returning channel formed in the well seat, and the water returning vertical pipes, the water returning channel and the water returning pipe constitute a communicating water returning system. According to the flood draining and water returning in-common device, a flood draining facility and a water returning facility are structurally combined and functionally independent to each other to achieve the functions of flood draining and water returning, the building engineering amount is little, the investment is low, the construction period is short, and operation and management are convenient.
Owner:CHINA ENFI ENGINEERING CORPORATION

Communication tower armored cabin body

The invention relates to the technical field of communication towers, in particular to a deck bin body of the communication tower, which is an improvement on the prior art. The deck bin body of the communication tower is characterized by comprising a steel frame structure, a steel plate, a deck layer and a heat insulated layer; the outer later of the steel frame structure is provided with the deck layer; the heat insulated layer is arranged in the steel frame structure; the steel frame structure is provided with the steel plate; and the steel frame structure is connected by bolts. The invention has the advantages that firstly the construction workload of the engineering is smaller, the construction period is shorter and the cost is lower; secondly, the influence on the environment is reduced; thirdly, the integral performance is reliable and the deck bin body has the characteristics of theft prevention, vibration resistance, wind resistance, and the like; and fourthly, the heat preserving and insulating performances are good. The deck bin body has greater market potential.
Owner:GUANGDONG XINEXIN COMM DEV

Steam exhaust device for direct air-cooling unit

The invention discloses a steam exhaust device for a direct air-cooling unit. A wet and cool steam condenser is arranged in the steam exhaust device, and the steam side of the wet and cool steam condenser communicates with a steam channel of the steam exhaust device. On the premise of not affecting the original functions, the wet and cool steam condenser is additionally arranged inside the steam exhaust device so that the steam condensation function can be added, and the steam exhaust device with the built-in peak steam condenser is formed. When the steam exhaust device is applied to the direct air-cooling unit, peak steam condensation can be achieved, the technical requirement for steam condensation can be met, neither steam exhaust branches for peak steam condensation nor independent peak steam condensers are required, accordingly, the steam exhaust structure of the direct air-cooling unit can be arranged to be simple and compact advantageously, then the construction work amount, construction difficulty and construction cost of the direct air-cooling unit can be significantly reduced, economical efficiency is good, reliability is high, and practicability is high.
Owner:DONGFANG TURBINE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products