Unlock instant, AI-driven research and patent intelligence for your innovation.

Fabricated clamping structure of deepwater pile foundation construction steel casing

A technology of deep-water pile foundation and steel casing, which can be used in infrastructure engineering, sheet pile walls, buildings, etc., can solve the problems of poor butt joint effect, troublesome adjustment of hole positions, troublesome disassembly, etc., so as to facilitate the disassembly and installation of steel Guard body, increase the connection effect, increase the sealing effect

Active Publication Date: 2022-07-29
CCCC SECOND HIGHWAY ENG CO LTD
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the construction of deep-water pile foundations, steel casings are required, and the two steel casings need to be docked. When the two steel casings are installed and docked, bolts are used to fix them, and the butt holes on the two steel casings need to be connected. Align the positions, and then install the bolts. Due to the large size of the steel casing, it is more troublesome to adjust the hole position, which leads to time-consuming and laborious for the user, and it is more troublesome to disassemble. In addition, when the existing part is installed and docked with the two steel casings , its butt joint seal is not good, resulting in poor butt joint effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fabricated clamping structure of deepwater pile foundation construction steel casing
  • Fabricated clamping structure of deepwater pile foundation construction steel casing
  • Fabricated clamping structure of deepwater pile foundation construction steel casing

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] refer to Figure 1-Figure 8 : The present invention provides a technical solution: a prefabricated clamping structure for a steel casing for deep-water pile foundation construction, comprising: a steel casing body 1, on which a docking component is provided; a fixing mechanism 2, including a fixing mechanism The cylinder 201 and the clamping part, the fixed cylinder 201 is fixedly sleeved on the outer surface of the steel casing body 1, and the clamping part is set in the fixed cylinder 201; the rotating mechanism 3, the rotating mechanism 3 includes a supporting cylinder 301, a rotating part, two groups of Fixed parts, adjustment parts and four sets of rotating parts, the support cylinder 301 is fixedly sleeved on the outer surface of the steel casing body 1, each fixed part and adjustment part are set on the support cylinder 301, the rotating part is set on the fixed part, Each group of adjustment parts is arranged on the adjustment part; and the sealing mechanism 4, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an assembly type clamping structure of a deepwater pile foundation construction steel casing. The assembly type clamping structure comprises a steel casing body, and a butt joint component is arranged on the steel casing body; the fixing mechanism comprises a fixing cylinder and a clamping part, the fixing cylinder is fixedly arranged on the outer surface of the steel casing body in a sleeving mode, the clamping part is arranged in the fixing cylinder, a fixing gear ring drives a connecting plate and a fixing rod to rotate by rotating a fixing handle, when the fixing rod rotates to a proper position, the steel casing body is in butt joint, the fixing rod is inserted into the fixing cylinder at the moment, and the steel casing body is fixed. Two first two-way threaded rods can rotate through transmission of a connecting synchronous wheel, two clamping rods get close to each other, a user can conveniently disassemble and assemble the steel casing bodies, meanwhile, alignment is facilitated, and therefore the two steel casing bodies can be in butt joint rapidly; therefore, the connecting effect of the connecting pipe and the butt joint pipe is improved, and the sealing performance is improved.

Description

technical field [0001] The invention belongs to the technical field of technical steel protective tube installation, in particular to an assembled clamping structure of a steel protective tube for deep-water pile foundation construction. Background technique [0002] Steel casing is in the process of manual digging of hole piles. Due to unstable soil conditions, it is difficult to construct reinforced concrete retaining walls. Therefore, steel retaining walls are used to protect the hole piles to prevent hole collapse and avoid affecting the construction progress and safety. The steel casing is a circular barrel with empty ends formed by iron sheets according to the size of the hole pile. The function of the steel casing is to stabilize the hole wall, prevent the hole from collapsing, and can also isolate the surface water, guide the drill bit, and fix it. Pile position, protect the original ground for operation, etc. [0003] In the construction of deep-water pile foundati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/08E02D5/52E02D27/52
CPCE02D17/08E02D5/526E02D27/52E02D2300/0029E02D2600/20E02D2250/0061
Inventor 张冬李哲喻江武查双吕周彬
Owner CCCC SECOND HIGHWAY ENG CO LTD