Super high-rise temporary protection device and protection method for building site construction

It is a technology for on-site construction and temporary protection, which is applied in construction, building structure, and construction material processing. It can solve the problems of cumbersome installation process, large limitations, and difficult disassembly and assembly, so as to improve installation efficiency, improve applicability, time-saving effect

Active Publication Date: 2022-07-29
CHINA CONSTR SECOND ENG BUREAU LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Most of the existing protective device installation methods use bolts and welding points. The installation process is very cumbersome, and it is not convenient to disassemble and install the protective frame, which affects the progress and efficiency of construction. Most of the connection methods use iron wires to tighten and add bolts. As the protective net is exposed to the sun and rain for a long time, it is easy to be damaged and needs to be replaced. However, the existing connection method is very cumbersome and time-consuming when disassembling the protective net. disassembly, limited

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Super high-rise temporary protection device and protection method for building site construction
  • Super high-rise temporary protection device and protection method for building site construction
  • Super high-rise temporary protection device and protection method for building site construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0034] see figure 1 , figure 2 and image 3 , the present invention provides a technical solution: a super high-rise temporary protection device for construction on a building site, comprising a two-way telescopic bearing plate 1, and two two-way telescopic bearing plates 1 are provided, and the front ends of the two two-way telescopic bearing plates 1 pass through The mounting plate 2 is symmetrically installed with two connecting...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a super high-rise temporary protection device for building site construction and a protection method, and relates to the technical field of related equipment for building construction. The super high-rise temporary protection device for building site construction comprises two bidirectional telescopic bearing plates, two connecting mechanisms are symmetrically mounted on the front end faces of the two bidirectional telescopic bearing plates up and down through mounting plates, the two ends of a vertical section communicate with one ends of two transverse sections correspondingly, and the two ends of the vertical section communicate with the other ends of the two transverse sections correspondingly; according to the device, rapid separation of the protective net part and the protective frame part can be achieved, installation and replacement of the protective net are facilitated, the applicability is improved, rapid installation of the device can be completed through the installation mechanism, the installation efficiency is improved, and the device is convenient to use. And compared with a traditional bolt installation mode, the installation efficiency is greatly improved, and the progress of building construction is accelerated.

Description

technical field [0001] The invention relates to the technical field of related equipment for building construction, in particular to a super high-rise temporary protection device and a protection method for construction site construction. Background technique [0002] Architecture is a general term for buildings and structures. It is an artificial environment created by people in order to meet the needs of social life, using the material and technical means they have mastered, and using certain scientific laws, Feng Shui concepts and aesthetic laws. For residential buildings with a height of more than 24 meters, non-single-storey workshops, warehouses and other civil buildings, in the construction process, in order to prevent the occurrence of high-altitude parabolas from the spilling of sand and gravel, protective devices need to be installed on the outer walls of the buildings. [0003] Most of the existing protective device installation methods adopt the method of bolts a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G21/32
CPCE04G21/3204
Inventor 叶铺岸孟珊肖星星杨华鹏雷俊
Owner CHINA CONSTR SECOND ENG BUREAU LTD