Method for elimianting subsidence of backfilled roadbed, bridge abutment and culvert wall back
A high filling and roadbed technology, applied in infrastructure engineering, roads, roads, etc., can solve problems such as bridge and culvert jumping, and achieve the effect of ensuring service performance, improving service performance, and saving engineering investment.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] Such as Figure 1-5 As shown, a method to eliminate post-construction settlement of subgrade high fill, bridge abutment, and backfill of culvert walls, before the soil foundation is handed over or at a certain stage of construction, according to the designed post-construction settlement, such as figure 1 According to the arrangement method of plum blossom piles as shown, the compacted piles are driven into the foundation or soil foundation, such as figure 2 ,image 3, Figure 4 As shown, the compaction piles are arranged longitudinally along the roadbed with small size and are arranged outwards with bridges and culverts and other structures and the steel flexible joints of the roadbed. The cross-section of the roadbed is arranged from the outside to the inside. The top surface of the compaction pile is oval, such as Figure 5 As shown, the shape of the pile body is wedge-shaped, the surface of the pile body is a threaded outer surface, and the pile body is solid. In ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 