Example Embodiment
[0088] The construction process of the large-area lime soil road mixing method of the present invention includes a "three-stage, five-section, and ten-process" construction process, in which the three stages include the preparation stage, the construction stage, and the renovation and acceptance stage; the preparation stage includes construction preparation and There are two processes for substrate treatment; the construction phase includes five sections, the five sections are: filling section, mixing section, leveling section, rolling section, and testing section. Among them: filling section includes Layered filling process; the mixing section includes two processes of initial pressing and leveling and ash distributing and mixing; the leveling section includes two processes of filling fine leveling and sprinkling and drying; the rolling section includes the rolling compaction process; the inspection section includes the inspection and visa process ; Refurbishment acceptance stage...
PUM
Property | Measurement | Unit |
---|---|---|
Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap