Method for accurately positioning and orienting drill hole of top arch

A technology of precise positioning and top arch, applied in the field of hydropower construction, can solve the problems of difficulty in climbing steps, unstable excavation quality, standardization, and limited programmed control means, so as to improve the excavation quality and reduce the influence of human factors. Effect

Inactive Publication Date: 2009-02-18
SINOHYDRO BUREAU 14 CO LTD
View PDF0 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the past, although the traditional construction method also used surveying and setting out to control the drilling points when excavating the contour surface, due to the lack of planning and design in advance, and the control of the drilling direction and drilling angle is basically controlled by the driller based on experience, standardization, The programmatic control means are relatively limited, which makes the excavation quality unstable and it is difficult to go up the steps

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for accurately positioning and orienting drill hole of top arch

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0018] Taking the excavation of the main powerhouse of the Three Gorges underground power station as an example: the excavation span of the top floor is 32.6m, and the top arch is composed of two small circular arcs and a large circular arc at the arch feet. The excavation quality of the contour line around the top arch directly affects the large Stability of the span plant. The traditional drilling construction is to use surveying and setting out to determine the opening point when excavating the contour surface. However, due to the rough planning and design in advance, and there is no relevant reference point for the control of the drilling direction and drilling angle, basically the driller relies on his own Experience control, human factors have greater influence. Standardized and procedural control methods are relatively limited, which makes the excavation quality unstable and cannot be guaranteed. "Characteristic holes", "intersecting holes" and "high and low holes" oft...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a top arc perforation accurate positioning and guiding method, including the following steps: before digging and blasting an underground chamber, fixing on the blasthole positions and spaces between the blastholes in advance, fixing on the perforation sites, accurately lofting and marking the perforation sites through a metering apparatus; and gradually putting out guide points within the range of 1.5-2m on the dug surfaces of the perforation sites behind the direction of a parallel line of the axis of the chamber, and at the same time arranging reference guide pipes for controlling obliquity and direction in an adjacent bored hole. During the perforation process, a borer can precisely control the boring direction and boring obliquity by taking the guide points, the blast semi-hole of the previous cannon and the guide pipes as the guide reference. The application of the method can ensure the over excavation to be controlled within 10cm. The method reduces influence from man-made factors and improves digging quality. Therefore the method has good market application prospect.

Description

technical field [0001] The invention belongs to the technical field of hydropower construction engineering, and in particular relates to a method for accurately positioning and guiding a top arch drilling hole when an underground cavern is excavated. Background technique [0002] As we all know, in the construction of underground caverns, drilling is the most critical link in the quality control of excavation forming. The quality of drilling is mainly affected by three factors: drilling position, drilling direction, and drilling inclination. In the past, although the traditional construction method also used surveying and setting out to control the drilling points when excavating the contour surface, due to the lack of planning and design in advance, and the control of the drilling direction and drilling angle is basically controlled by the driller based on experience, standardization, The programmatic control means are relatively limited, which makes the excavation quality...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B7/04E21B47/00F42D3/00E21D13/02
Inventor 尹俊宏史雁飞付勇谢勇兵代绍华常二广毛雪岩刘燕波唐奇晏红运龙贵兵李国庆张清盛杰张志斌
Owner SINOHYDRO BUREAU 14 CO LTD