Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for construction floating window

A construction method and construction technology, applied in the direction of architecture, building structure, etc., can solve the problems that the quality of the concrete of the bay window in civilized construction cannot be guaranteed, and achieve the effect of saving formwork

Inactive Publication Date: 2009-07-22
THE SECOND CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU
View PDF0 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantage of the current construction method is that the civilized construction on site and the quality of the bay window concrete cannot be guaranteed due to the secondary formwork and sporadic pouring of concrete at the edge of the window opening.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for construction floating window
  • Construction method for construction floating window
  • Construction method for construction floating window

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0011] The present invention will be further described in conjunction with the accompanying drawings.

[0012] The present invention proceeds according to the following steps: (1) pre-embed iron parts 4 at the corresponding positions of the main building 3 windows, such as figure 2 (2) according to the size and shape of the windows of the main building, the bay window 2 is prefabricated in a concentrated manner, and the iron parts 1 are also pre-embedded at the corresponding places between the prefabricated bay windows 2 and the embedded iron parts 4 of the windows of the main building, such as figure 1 shown; (3) the embedded iron parts 1 of the bay window are welded and installed together with the corresponding embedded iron parts 4 of the windows of the main building, as image 3 shown.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a bay window construction method, including the following steps: (1) iron parts are pre-embedded at the corresponding positions of a window of the main building; (2) the bay windows are collectively prefabricated according to the size and shape of the windows on the main building and the iron parts are also pre-embedded at the positions of the prefabricated bay windows which correspond to the pre-embedded iron parts on the main building; (3) the pre-embedded iron parts on the bay windows are connected with the corresponding pre-embedded iron parts on the window of the main building by welding. The invention carries out the collective prefabrication for the bay windows, thus saving the template and meeting the requirements of civil construction and the requirements of concrete quality. The method is especially suitable for the large-scale residence project.

Description

technical field [0001] The invention belongs to the field of construction engineering, and in particular relates to a construction method for a building bay window. Background technique [0002] In modern buildings, especially in residential building projects, windows are generally designed as bay windows, which protrude outside the building wall to meet the requirements of beauty and practicality. The existing bay window construction technology is generally; in the construction process of the main body of the building, the ribs of the bay window are reserved, and the ribs are chiseled out after the main body is constructed, and then the formwork is poured into concrete. The disadvantage of the current construction method is that due to the secondary formwork and sporadic pouring of concrete at the edge of the window opening, the civilized construction on site and the quality of the bay window concrete cannot be guaranteed. Contents of the invention [0003] In order to o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/00
Inventor 梁贵才
Owner THE SECOND CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products