Intelligent metering management system and method for construction engineering

A technology of construction engineering and management methods, applied in the direction of calculation, data processing applications, instruments, etc., can solve problems such as cost waste, inability to "engineer dynamic" management, unfavorable systematic construction management, etc., to ensure accuracy and scientificity, and improve The level of management and the effect of ensuring normal operation

Inactive Publication Date: 2009-08-12
ROAD AND BRIDGE CONSTRUCTION
View PDF0 Cites 32 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, because the process of manual measurement is only for the purpose of payment, the efficiency is low, so that the owner cannot carry out "dynamic" management of the project
[0004] At present, various provinces and cities have implemented investment control through some metering and payment systems, but the versatility is not strong, and it can only meet the targeted monthly financial reports. In fact, it is statistical management, which cannot meet the requirements of management control.
And if it is applied in this project, it will not be applicable to the next project, which brings great trouble to the user and causes unnecessary waste of cost; and most of the functions they realize are limited to the measurement required to complete the project The series of reports for payment is only a unified process of financial monthly report format, which cannot really achieve the purpose of the owner to control investment
Even if the mutual correspondence between measurement and payment has been established, the systematic operability of measurement has not been truly reflected, especially in the later settlement and audit, the search and verification workload is huge, which is not conducive to systematic construction management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent metering management system and method for construction engineering
  • Intelligent metering management system and method for construction engineering
  • Intelligent metering management system and method for construction engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0174] As an implementable mode, the implementation process includes the following steps:

[0175] Step S410, after the list data is added to the system, a data association table needs to be established for each list and graphic, which indicates which part of the list or sub-item corresponds to the graphic.

[0176] Step S420, after the association table is established, in the later measurement work, if the list or sub-item is measured, search the association table, and if there is a list associated with the graphic to be measured, display the associated image in a specified color .

[0177] and / or:

[0178] Modify the data of subsection items through various operations on graphics.

[0179] Because there is an associated table, you can find the corresponding graph through the list or sub-item. Conversely, you can also find the list or sub-item through the graph. If the data is modified in the graphic display window, it can be directly reflected in the corresponding list o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an intelligent system and an intelligent method for measurement, payment and settlement management. The system comprises a graphic module, a data management module, an entry module and a report module, wherein the graphic module is used for graphical displaying project data input by sub-projects of a construction project; the data management module is used for performing the sub-project measurement treatment of the project data according to the logic relations between the project data of the construction project; the entry module is used for entering actual development data of the project by project staff with different authorities according to actual development conditions of the project and generating an actual measurement list of the project; and the report module is used for outputting construction project data result reports of the sub-projects according to the data recorded according to the actual development conditions of the project. The system and the method can carry out effective information management of a measurement service in project construction.

Description

technical field [0001] The invention relates to the technical field of construction engineering information processing, in particular to a computer management system and method for intelligent measurement of construction engineering. Background technique [0002] National key construction projects, such as highway construction projects, have the characteristics of long lines, large investment, and many processes. How to use scientific management methods to effectively control and manage construction investment and make management process-oriented, standardized, and scientific is the current construction New issues faced by owners. [0003] In the past, traditional manual measurement was used, and only systematic management was carried out for monthly financial payment reports. It was difficult for owners who managed multiple contract segments at the same time to ensure accurate and timely measurement and payment data, especially in data review and error finding. , historica...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/00G06Q50/00G06Q10/06
Inventor 芮捷冀海军
Owner ROAD AND BRIDGE CONSTRUCTION
Features
  • Generate Ideas
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More